Update on long-delayed Damen Green stop construction project, the contract for which was awarded last October from CDOT: "Permit has not been obtained. Projected construction to start May 2022 with a duration through May 2023."

Background: https://t.co/bReWJ6CzKW @DavidZegeye pic.twitter.com/9gR2u5GfxU

— Streetsblog Chicago (@streetsblogchi) March 22, 2022