Jump to content

Search the Community

Showing results for tags 'Red Line'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Chicago Transit Authority
    • CTA General Discussion
    • CTA Bus
    • CTA Rail
  • Chicago Region
    • Regional Transit Planning
    • Pace Suburban Bus
    • Metra Commuter Rail
  • Everything Else
    • General Transit Discussion

Group


AIM


Yahoo


Skype


Twitter


Google+


Facebook


Instagram


Flickr


YouTube


Snapchat


Website URL


Location


Interests


Favorite Bus


Favorite Railcar

Found 6 results

  1. Looks like they are putting a switch in from track 1 to track 2, just south of Lawrence/Red line. I guess that's part of the preliminary work that needs to be done before the project will start. Looks like they are starting at track 1 and working they're way to four, unlike both Belmont and Fullerton/Red line which was the opposite.
  2. There was some discussion on CTA Tattler today regarding the upcoming Red & Purple Modernization Project public scoping meetings. There are more details about all of the proposed alternatives in the Notice of Intent filed with the FTA. (Credit to Hugh Bartling for finding this document.) First, there's the "No Action Alternative" which would do nothing. The "Basic Rehabilitation Alternative" would essentially put lipstick on a pig, while the "Basic Rehabilitation with Transfer Stations Alternative" would add Purple Line transfer stations at Wilson and Loyola. Both the "Modernization 4-Track Alternative" and "Modernization 3-Track Alternative" would permanently close four stations: South Blvd, Jarvis, Thorndale, and Lawrence. Both of these options would replace the existing structure and embankment with "modern concrete aerial structure" while also rebuilding most stations. The 3-Track option would allow for Purple Line Express service in only a single direction. The "Modernization 2-Track Underground Alternative" would replace most of the existing Red Line structure with a two-track subway. Trains would transition below ground after Belmont, following the Brown Line tracks and then running under Sheffield/Sheridan to the intersection of Sheridan and Broadway, where they would then run under Broadway until returning to elevated just north of Loyola. Subway stations would be constructed at Addison, Irving Park, Wilson, Foster, Bryn Mawr, Glenlake, and Devon/Loyola. Purple Line Express service would be discontinued in favor of more frequent local service. I created a map of what this proposed subway portion would look like. (Not that I actually expect this to ever get built.) Public meetings will be held in Uptown, Edgewater, Rogers Park, and Evanston next week to get input on the alternatives.
  3. Red Line Extension (RLE)

    I'm trying to follow the logic about the CTA wanting to extend the Red Line to 130th via a shared elevated embankment with a Union Pacific Freight Line. Are they saying that they will lay third rail next to existing freight tracks and share said tracks with a freight line? Initially, I thought not and that would be impossible, but when you put "share" in the context, that changes the meaning. If this is being read correctly, does the CTA realize what kind of delays they are in for from 95th to 130th? Freight Trains can be anywhere from 100-200 cars in length and cause "Freight Delays" on all Metra lines where Metra and Freight co-exist. Story
  4. Red-Purple Bypass Project

    There is an article today that talks about the brown line flyover. I'm surprised they have to demolish up to 16 houses for this? Can't they just build over the existing structure? http://www.dnainfo.com/chicago/20140417/lakeview/ctas-belmont-station-bypass-16-lakeview-buildings-needed
  5. Clark/Division Red Line Rehab

    I took a few pictures of the Clark/Division station on the Red line. At street level, on Lasalle, they already have concrete staircases in place and the big hole over Division has been filled. Looks like they want to open up the street for November. At platform level, they have now opened up an area on the east side of the station and we can now see the decorative ceiling tiles they are installing. They also have one light bar installed, and the marble sheeting on the floor of the station in that section. (pictures from left to right are: Lasalle SE corner, Lasalle NE corner, station ceiling, station lightbar, station floor)
  6. Dan Ryan Track Renewal Project

    (starting a new thread since this topic really didn't fit under the Red-Purple Modernization thread) It looks like the Dan Ryan branch track project is going to roll out as someone else originally projected many weeks ago – a complete shutdown of the south branch of the Red Line from just south of Roosevelt to 95th. Subsequent to that post, I had heard that the CTA was going to offer a second option of weekend-only work for 4 years, but that the preferred plan was the complete 5-month shutdown. They had decided to present the second, weekend-only option, in order to give the appearance that they were offering the community and aldermen an option. Well, it now looks like the weekend-only closures option is not seriously being considered. They are going with the complete shutdown plan. The complete Dan Ryan branch shutdown will begin in spring 2013 and last through the summer. The details are basically as Mayfield laid out weeks ago: Red Line will shut down completely from south of Roosevelt station to 95th in spring 2013 The shutdown will continue for 5 months Southbound Red line trains will be rerouted to Green line tracks after stopping at Roosevelt and will serve all Green line stops to Ashland/63rd Express bus shuttles will run from Garfield Green station to 63rd, 69th, 79, 87th, and 95th Red. there will be other additional supplemental bus service One thing that changed since Mayfield outlined this plan is that the CTA intends to offer some free and discounted fares to some riders affected by the shutdown. This helped to ensure the support of the aldermen, at least in one office I am aware of. Not sure of the extent of these free fares. This is still under discussion. I heard possibly free shuttle buses and free fares boarding at Garfield Greenline station. Also, the CTA has reached out to and received the support of the Chicago Urban League (for support on hiring issues?). As I hear it, the big selling point is the number of jobs this project will create. This information is for your information and discussion. I have no official proof I will post, and no official sources I will identify. Doing so would probably cut off my source of info. .
×