Per Alderman Osterman, Bryn Mawr will be receiving work this October that will be somewhere between a Renew Crew visit and an Interim Rehab. Improvements will include a deep cleaning, new doors, new lights, new wall finishes, and new signage. This will involve a weekend street closure, but the station itself will not close.

Share this post


Link to post
Share on other sites

Took a look at Morse Red line over the weekend. I was surprised to see exposed glass (unprotected from vandals) until I touched it. It's plastic. Looks like glass. I wonder though can it still be scratched. Some of these vandals are pretty persistent. I fear soon it may look like a hazy mess

Two weeks ago when I was at Morse I couldn't help noticing, the plastic windows were starting to get scratched up and hazy around the Lunt entrance. Since then they have put up the protection metal grid over all the plastic windows. Argyle and Thorndale with reopen with this. I also noticed all new ties on the SB red line track from Granville to Lawrence. The train seems to fly through the closed stations now at full speed. (I wonder if the bridge repairs are done now.) The biggest pain up there is the NB purple line track that still crawls (at 15mph) up to Bryn Mawr. They got to fix that track. Weird enough the bridge repairs on that track use the older wooden ties, some with cracks already in them. I wonder why they waste there time with those, they seem inferior to the new ties.

Share this post


Link to post
Share on other sites

Two weeks ago when I was at Morse I couldn't help noticing, the plastic windows were starting to get scratched up and hazy around the Lunt entrance. Since then they have put up the protection metal grid over all the plastic windows. Argyle and Thorndale with reopen with this. I also noticed all new ties on the SB red line track from Granville to Lawrence. The train seems to fly through the closed stations now at full speed. (I wonder if the bridge repairs are done now.) The biggest pain up there is the NB purple line track that still crawls (at 15mph) up to Bryn Mawr. They got to fix that track. Weird enough the bridge repairs on that track use the older wooden ties, some with cracks already in them. I wonder why they waste there time with those, they seem inferior to the new ties.

Speaking of Argyle and Thorndale, Thorndale reopens Friday and Argyle the following Friday.

Share this post


Link to post
Share on other sites
Guest ctafan630

With the Wilson Station renovation, Wilson will be come a transfer point for the Purple Line express. How many more stops can be added before it is no longer considered an express train?

Share this post


Link to post
Share on other sites

Chicagoans and Evanstonians probably got spoiled by that long non-stop run south of Howard St; even with the express runs that were only express south of Granville interlocking. At least they still had the express tracks south of Armitage. But time marched on and even with the dropping of the surcharge, adding all the Brown line stops was probably the last insult.

I would suggest comparing ours to the NYC expresses on the four tracked mains to come up with a good ratio of express vs local stops. Here's a good map.

http://www.mta.info/...maps/submap.htm

David Harrison

Notwithstanding with the Nassau Line/6 Avenue Local (J, M, Z), where they still have skip-stop, It's still an express if you're skipping any number of [stops > x > 1]. Many of those NYC lines have expresses that cover blocks, if not miles of stops skipped).

Red/Purple is not a skip-stop, but you're bypassing half of the NSM. [Howard > Loyola (?) > Wilson > Belmont]

Share this post


Link to post
Share on other sites
Guest ctafan630

Here's a good map.

http://www.mta.info/nyct/maps/submap.htm

David Harrison

That map is enough to make my head spin. Man I am glad I don't have to take the NYC subway.

Share this post


Link to post
Share on other sites

That map is enough to make my head spin. Man I am glad I don't have to take the NYC subway.

After you've ridden the system once, you'd get it (or vow never to return again).

Share this post


Link to post
Share on other sites

Did you guys see that the Lawrence red line station is being built with a wooden platform, not precast concrete. I wonder if the project is overbudget or the structure can't handle the weight there?

Share this post


Link to post
Share on other sites

Did you guys see that the Lawrence red line station is being built with a wooden platform, not precast concrete. I wonder if the project is overbudget or the structure can't handle the weight there?

Strange.

However, you have the situation that it is half steel and half concrete there, which also may mean that it is impacted by the Wilson project (to the extent that the track pattern is going to be reworked).

Share this post


Link to post
Share on other sites

Did you guys see that the Lawrence red line station is being built with a wooden platform, not precast concrete. I wonder if the project is overbudget or the structure can't handle the weight there?

the reason why they are using wood instead of concrete is explained here:

http://www.ctastationwatch.com/main-line/587

Share this post


Link to post
Share on other sites

Moved per the scope police:

...

A few construction updates: They are finally putting the steel up to what I'm assuming is the expanded Loyola station unless it's something else on the property,...

The CTA Tattler says that the Loyola plaza project is done.

Share this post


Link to post
Share on other sites

Yes, I'm surprised. It looks bigger than what my pictures show. It looks like they took advantage of the area along the tracks. It shouldbe interesting when the Loyola campus apartments are done. The plaza is going to be surrounded by concrete walls on three sides. Still though the plaza is smaller than most city park playlots, and it doesn't help that all shots are from Sheridan Sb.

Share this post


Link to post
Share on other sites

I don't know why but track speeds seem to be getting slower on the north branch on the red line main around loyola to howard. They just replaced the ties there and many of the rail bridges in that area so what gives? The purple line is painfully slow nb also, but they haven't touched the ties. It's kind of strange to work on the ravenswood connector when this needs more attention in my opinion.

Share this post


Link to post
Share on other sites

I don't know why but track speeds seem to be getting slower on the north branch on the red line main around loyola to howard. They just replaced the ties there and many of the rail bridges in that area so what gives? The purple line is painfully slow nb also, but they haven't touched the ties. It's kind of strange to work on the ravenswood connector when this needs more attention in my opinion.

While,i agree the work needs to be done.It seen the CTA can't get stuff fix right the first time. Another Blue Line train got derail by O'Hare again.Claypool and Emanuel want people to pay 5 dollars for the service . :angry:

Share this post


Link to post
Share on other sites

TECHNOLOGY? WTF (Why That's Farfetched).

I rode the red line round trip between Lake and Ashland/63 saturday. Brand new 14th st. interlocking, incline foundation and track. New signals, ties, tie plates and clips. 15 MPH NB from 16th to the 8 car berthing mark at Roosevelt??? That was a 35mph zone back in the day.

During the time I rode the Englewood/Howard almost daily from 1968 to 1975, slow zones were rare and brief. You may say this is the result of the speed/braking of heavier cars. Track technology doesn't address this?

High speed cars (since 1963) on this system is like running the Indy 500 on old Route 30.

Share this post


Link to post
Share on other sites

I don't know, the only thing that I can say about the north main is if you fix the ties and you still have slow zones it must be the structure, but then why would you fix the track in the first place, I would fix the structure. A good experiment would be to time the #147 against the Red line, I bet if you board around Water Tower Place you could actually get a faster commute. Hopefully when they complete the Dan Ryan the south side will have faster trains!! We can always hope. :rolleyes:

Share this post


Link to post
Share on other sites

I don't know, the only thing that I can say about the north main is if you fix the ties and you still have slow zones it must be the structure, but then why would you fix the track in the first place, I would fix the structure. A good experiment would be to time the #147 against the Red line, I bet if you board around Water Tower Place you could actually get a faster commute. Hopefully when they complete the Dan Ryan the south side will have faster trains!! We can always hope. :rolleyes:

10 years ago the bus beat the train.

Somebody on the CTA Tattler complains that they didn't fix the crossovers near Granville, and Brian Steele said there that that would become part of the vision thing. Someone here claimed that there was nothing wrong with it.

As far as structure, it is on an embankment, so the only question there is whether the earth is going to collapse. They supposedly fixed the viaducts, but, maybe like the LSD one at LaSalle Drive, maybe only cosmetically.

In any event, the July 2013 Slow Zone Report shows northbound completely track slow zones, so any track they replaced is still no good, according to CTA. Southbound shows all types of slow zones around Loyola, but that apparently is mostly power and construction, and power is supposed to be corrected by renovating the Farwell substation.

Share this post


Link to post
Share on other sites

10 years ago the bus beat the train.

I timed it last month from Morse and from Bryn Mawr. Regardless of when you take the 147, it seems to be faster than the Red Line (85% of the time).

Share this post


Link to post
Share on other sites

I timed it last month from Morse and from Bryn Mawr. Regardless of when you take the 147, it seems to be faster than the Red Line (85% of the time).

I used simpler techniques, i.e. note the fleet number on the roof of the bus pulling into Howard when the train was leaving, then getting off the train at Chicago and seeing that bus on Michigan Ave. Not quite precise, but good enough.

Share this post


Link to post
Share on other sites

I used simpler techniques, i.e. note the fleet number on the roof of the bus pulling into Howard when the train was leaving, then getting off the train at Chicago and seeing that bus on Michigan Ave. Not quite precise, but good enough.

did that from Van Buren to Howard. Despite the PM, rush the 147 was already leaving Howard (interlined to a 22) by the time my train pulled in.

Share this post


Link to post
Share on other sites

I don't know, the only thing that I can say about the north main is if you fix the ties and you still have slow zones it must be the structure, but then why would you fix the track in the first place, I would fix the structure.

Im still asking the same about the Dan Ryan...supposedly bad drainage (the cause for the shutdown) was the reason for the switch from concrete ties on that section (decades ago), yet the problem is just now getting addressed. And Chicago-L.org has mentioned the drainage issue LONG before Emmanuel and Claypool addressed it. I personally feel that if it were gonna come to a shutdown like this, they could've done it while they did the power/signal upgrades back in 2004. Then again that wouldve been a bit more of a challenge to run the shuttles without as many artics as we had now. I doubt the 7300's would've survived that much even if the NABI'S did the shuttles

Share this post


Link to post
Share on other sites

Im still asking the same about the Dan Ryan...supposedly bad drainage (the cause for the shutdown) was the reason for the switch from concrete ties on that section (decades ago), yet the problem is just now getting addressed. And Chicago-L.org has mentioned the drainage issue LONG before Emmanuel and Claypool addressed it. I personally feel that if it were gonna come to a shutdown like this, they could've done it while they did the power/signal upgrades back in 2004. Then again that wouldve been a bit more of a challenge to run the shuttles without as many artics as we had now. I doubt the 7300's would've survived that much even if the NABI'S did the shuttles

While it would have made sense to do everything at once.The fact is there wasn't enough money to do it.At the time bypass was use.rather if it would have been feasible to use bypass when all the work is being done is something nobody will ever know.

Share this post


Link to post
Share on other sites

While it would have made sense to do everything at once.The fact is there wasn't enough money to do it.At the time bypass was use.rather if it would have been feasible to use bypass when all the work is being done is something nobody will ever know.

My only point (at least a year ago) was that they said they fixed the slow zones in 2007, but apparently didn't fix anything. Maybe Kruesi and Daley figured that they couldn't take the political heat for shutting the line down and doing it right the first time.

The relevant comparison is that they had all sorts of track outages on the north side last year, and again appear not to have fixed anything. The work done then was supposed to last until the "vision thing" arrived in 10 years. Maybe the station platforms and entry houses will hold up that long.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • By BusHunter
      There is an article today that talks about the brown line flyover. I'm surprised they have to demolish up to 16 houses for this? Can't they just build over the existing structure?
       
      http://www.dnainfo.com/chicago/20140417/lakeview/ctas-belmont-station-bypass-16-lakeview-buildings-needed
    • By newport
      (starting a new thread since this topic really didn't fit under the Red-Purple Modernization thread)

      It looks like the Dan Ryan branch track project is going to roll out as someone else originally projected many weeks ago – a complete shutdown of the south branch of the Red Line from just south of Roosevelt to 95th. Subsequent to that post, I had heard that the CTA was going to offer a second option of weekend-only work for 4 years, but that the preferred plan was the complete 5-month shutdown. They had decided to present the second, weekend-only option, in order to give the appearance that they were offering the community and aldermen an option.

      Well, it now looks like the weekend-only closures option is not seriously being considered. They are going with the complete shutdown plan. The complete Dan Ryan branch shutdown will begin in spring 2013 and last through the summer.

      The details are basically as Mayfield laid out weeks ago:
      Red Line will shut down completely from south of Roosevelt station to 95th in spring 2013 The shutdown will continue for 5 months Southbound Red line trains will be rerouted to Green line tracks after stopping at Roosevelt and will serve all Green line stops to Ashland/63rd Express bus shuttles will run from Garfield Green station to 63rd, 69th, 79, 87th, and 95th Red. there will be other additional supplemental bus service
      One thing that changed since Mayfield outlined this plan is that the CTA intends to offer some free and discounted fares to some riders affected by the shutdown. This helped to ensure the support of the aldermen, at least in one office I am aware of. Not sure of the extent of these free fares. This is still under discussion. I heard possibly free shuttle buses and free fares boarding at Garfield Greenline station.

      Also, the CTA has reached out to and received the support of the Chicago Urban League (for support on hiring issues?). As I hear it, the big selling point is the number of jobs this project will create.

      This information is for your information and discussion. I have no official proof I will post, and no official sources I will identify. Doing so would probably cut off my source of info.
      .

    • By BusHunter
      Looks like they are putting a switch in from track 1 to track 2, just south of Lawrence/Red line. I guess that's part of the preliminary work that needs to be done before the project will start. Looks like they are starting at track 1 and working they're way to four, unlike both Belmont and Fullerton/Red line which was the opposite.
    • By BusHunter
      I took a few pictures of the Clark/Division station on the Red line. At street level, on Lasalle, they already have concrete staircases in place and the big hole over Division has been filled. Looks like they want to open up the street for November. At platform level, they have now opened up an area on the east side of the station and we can now see the decorative ceiling tiles they are installing. They also have one light bar installed, and the marble sheeting on the floor of the station in that section. (pictures from left to right are: Lasalle SE corner, Lasalle NE corner, station ceiling, station lightbar, station floor)




    • By sw4400
      I'm trying to follow the logic about the CTA wanting to extend the Red Line to 130th via a shared elevated embankment with a Union Pacific Freight Line. Are they saying that they will lay third rail next to existing freight tracks and share said tracks with a freight line? Initially, I thought not and that would be impossible, but when you put "share" in the context, that changes the meaning.

      If this is being read correctly, does the CTA realize what kind of delays they are in for from 95th to 130th? Freight Trains can be anywhere from 100-200 cars in length and cause "Freight Delays" on all Metra lines where Metra and Freight co-exist.