7 hours ago, CTA5750 said:

The ramp wont be completed until 2025!!!!  Wow I cant imagine the headaches riders and people from the neighborhood are going to be experiencing. Thats a long time!!! 

I suppose its better than shutting down the Red. Brown, and Purple Lines between Belmont and Wilson (Brown Line at Southpprt) for 5 months straight

 

Share this post


Link to post
Share on other sites
7 hours ago, CTA5750 said:

The ramp wont be completed until 2025!!!!  Wow I cant imagine the headaches riders and people from the neighborhood are going to be experiencing. Thats a long time!!! 

The ramp itsself will be done by 2021. Its special trackwork and realignment that's taking till 2025

Share this post


Link to post
Share on other sites
12 minutes ago, Sam92 said:

The ramp itsself will be done by 2021. Its special trackwork and realignment that's taking till 2025

Why is that going to take longer than the installation of the ramp? I understand a switch is being added, but it takes that long?

Share this post


Link to post
Share on other sites
3 hours ago, NewFlyerMCI said:

Why is that going to take longer than the installation of the ramp? I understand a switch is being added, but it takes that long?

The flyover will be done 1st.  After that, CTA will align the tracks between Clark Junction and Addison.

Share this post


Link to post
Share on other sites
1 hour ago, chicagocubs6323 said:

The flyover will be done 1st.  After that, CTA will align the tracks between Clark Junction and Addison.

I got that part. My question is why is the realignment going to take longer than the construction of the flyover?

Share this post


Link to post
Share on other sites
15 minutes ago, NewFlyerMCI said:

I got that part. My question is why is the realignment going to take longer than the construction of the flyover?

They're not doing it all at the same time.  The whole project which also includes the modernization of stations between Lawrence and Bryn Mawr and more track work in that corridor will end in 2025.  Remember there's more than just realigning and building a flyover.

Share this post


Link to post
Share on other sites
1 hour ago, chicagocubs6323 said:

They're not doing it all at the same time.  The whole project which also includes the modernization of stations between Lawrence and Bryn Mawr and more track work in that corridor will end in 2025.  Remember there's more than just realigning and building a flyover.

Yes, I understand not everything is happening at once, read what I wrote

1 hour ago, NewFlyerMCI said:

I got that part. My question is why is the realignment going to take longer than the construction of the flyover?

I didn't ask why the entire project wasn't going to be finished until 2025. By CTA's projections, construction should start on Lawr-BM & RP Bypass late this winter, and the track realignment after those are completed, I understand this. I am specifically asking about the track realignment only, and why it's going to take 4 years, since I can't find anything on the website as to why it would take 3-4 years if the bypass (which seems like the more demanding project) is only going to take 2.

Share this post


Link to post
Share on other sites
4 minutes ago, chicagocubs6323 said:

I already answered your question.  It's not taking 4 years just to do that.  

What else is happening during this time period then? That reads like 3-4 years to me.

RPM_RPB.PNG

Share this post


Link to post
Share on other sites
1 hour ago, NewFlyerMCI said:

What else is happening during this time period then? That reads like 3-4 years to me.

RPM_RPB.PNG

I literally answered it all for you already.  

 

4 hours ago, chicagocubs6323 said:

The flyover will be done 1st.  After that, CTA will align the tracks between Clark Junction and Addison.

Why are you still arguing with me?

Share this post


Link to post
Share on other sites
2 hours ago, chicagocubs6323 said:

I literally answered it all for you already.  

 

Why are you still arguing with me?

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)
  • Upvote 1

Share this post


Link to post
Share on other sites
6 hours ago, NewFlyerMCI said:

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)

To realign the tracks, one track will be out of service at a time, similar to the construction of the Belmont Fullerton, and Wilson station. They have to remove the old track and build a new track, and repeat this for each track.  

  • Thanks 2

Share this post


Link to post
Share on other sites
6 hours ago, NewFlyerMCI said:

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)

Because with as heavy volume as the Northside handles it can't do a major disruption or shutdown without affecting a HUGE amount of people nor is there space for fast shuttles in such an area

  • Thanks 1

Share this post


Link to post
Share on other sites
18 hours ago, Sam92 said:

The ramp itsself will be done by 2021. Its special trackwork and realignment that's taking till 2025

Even so! Im sure there will still be massive headaches as congested as the area is already!  As ,many of us here already know, you shut down one or two through streets street in Wrigleyville  It causes major headaches for the surrounding area  And it will be even more of a mess during Cubs games  And there will no doubt be some slowdowns with all through that junction during the work process 

Share this post


Link to post
Share on other sites
56 minutes ago, CTA5750 said:

Even so! Im sure there will still be massive headaches as congested as the area is already!  As ,many of us here already know, you shut down one or two through streets street in Wrigleyville  It causes major headaches for the surrounding area  And it will be even more of a mess during Cubs games  And there will no doubt be some slowdowns with all through that junction during the work process 

Yeah that's what I pointed out in my previous post. The volume passenger and trainwise is too vast for them to do anything to expedite this project outside of closing 1-2 tracks. Then add to that the work is most likely bringing the structure up to Addison to look more like what's at belmont 😬

Share this post


Link to post
Share on other sites

Actually there should be four tracks available much of the time. Assuming the SB local can be straightend without impacting existing SB local. Then you cut over to new alignment, take out and replace the old, cut over SB express, repeat process. Assuming new does not foul old, as I said. If it does, then three in use at a time.

Yes, it does take a LOT more time to build anything today than 100 years ago, when the SS Main was triple-tracked in months while maintaining service to all stations. Just how it is.

Share this post


Link to post
Share on other sites
2 hours ago, Mr.NewFlyer1051 said:

Got an update for RPM

looks like demolition of NB tracks begin Fall 2020

 

F7BB5058-B138-4F46-A6DE-87E993172BF6.png

Are we building a new steel structure or are we rebuilding a stronger concrete structure?

Share this post


Link to post
Share on other sites
On 1/11/2020 at 11:03 AM, Mr.NewFlyer1051 said:

Got an update for RPM

looks like demolition of NB tracks begin Fall 2020

 

F7BB5058-B138-4F46-A6DE-87E993172BF6.png

Just checking on when work will resume with the Thorndale interlocking and the start of the Montrose interlocking? It seems they took a break for a few weeks now.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Similar Content

    • By BusHunter
      There is an article today that talks about the brown line flyover. I'm surprised they have to demolish up to 16 houses for this? Can't they just build over the existing structure?
       
      http://www.dnainfo.com/chicago/20140417/lakeview/ctas-belmont-station-bypass-16-lakeview-buildings-needed
    • By newport
      (starting a new thread since this topic really didn't fit under the Red-Purple Modernization thread)

      It looks like the Dan Ryan branch track project is going to roll out as someone else originally projected many weeks ago – a complete shutdown of the south branch of the Red Line from just south of Roosevelt to 95th. Subsequent to that post, I had heard that the CTA was going to offer a second option of weekend-only work for 4 years, but that the preferred plan was the complete 5-month shutdown. They had decided to present the second, weekend-only option, in order to give the appearance that they were offering the community and aldermen an option.

      Well, it now looks like the weekend-only closures option is not seriously being considered. They are going with the complete shutdown plan. The complete Dan Ryan branch shutdown will begin in spring 2013 and last through the summer.

      The details are basically as Mayfield laid out weeks ago:
      Red Line will shut down completely from south of Roosevelt station to 95th in spring 2013 The shutdown will continue for 5 months Southbound Red line trains will be rerouted to Green line tracks after stopping at Roosevelt and will serve all Green line stops to Ashland/63rd Express bus shuttles will run from Garfield Green station to 63rd, 69th, 79, 87th, and 95th Red. there will be other additional supplemental bus service
      One thing that changed since Mayfield outlined this plan is that the CTA intends to offer some free and discounted fares to some riders affected by the shutdown. This helped to ensure the support of the aldermen, at least in one office I am aware of. Not sure of the extent of these free fares. This is still under discussion. I heard possibly free shuttle buses and free fares boarding at Garfield Greenline station.

      Also, the CTA has reached out to and received the support of the Chicago Urban League (for support on hiring issues?). As I hear it, the big selling point is the number of jobs this project will create.

      This information is for your information and discussion. I have no official proof I will post, and no official sources I will identify. Doing so would probably cut off my source of info.
      .

    • By BusHunter
      Looks like they are putting a switch in from track 1 to track 2, just south of Lawrence/Red line. I guess that's part of the preliminary work that needs to be done before the project will start. Looks like they are starting at track 1 and working they're way to four, unlike both Belmont and Fullerton/Red line which was the opposite.
    • By BusHunter
      I took a few pictures of the Clark/Division station on the Red line. At street level, on Lasalle, they already have concrete staircases in place and the big hole over Division has been filled. Looks like they want to open up the street for November. At platform level, they have now opened up an area on the east side of the station and we can now see the decorative ceiling tiles they are installing. They also have one light bar installed, and the marble sheeting on the floor of the station in that section. (pictures from left to right are: Lasalle SE corner, Lasalle NE corner, station ceiling, station lightbar, station floor)




    • By sw4400
      I'm trying to follow the logic about the CTA wanting to extend the Red Line to 130th via a shared elevated embankment with a Union Pacific Freight Line. Are they saying that they will lay third rail next to existing freight tracks and share said tracks with a freight line? Initially, I thought not and that would be impossible, but when you put "share" in the context, that changes the meaning.

      If this is being read correctly, does the CTA realize what kind of delays they are in for from 95th to 130th? Freight Trains can be anywhere from 100-200 cars in length and cause "Freight Delays" on all Metra lines where Metra and Freight co-exist.