There is a newspaper article in today's Redeye that shows new BRT's in the test phase in Cleveland. They show a picture of one of the buses. It has the BRT styling. The article claims the CTA is studying there planned rollout of BRT service in Cleveland. Well at least there buses look like BRT's. :P

Link to comment
Share on other sites

Guest metralink

There is a newspaper article in today's Redeye that shows new BRT's in the test phase in Cleveland. They show a picture of one of the buses. It has the BRT styling. The article claims the CTA is studying there planned rollout of BRT service in Cleveland. Well at least there buses look like BRT's. :P

Pace looked at the same type of vehicle back in 2006, they have a 60 ft and 45ft version. Same as what is operating in LA Metro and Eugene. There was an article in the Daily Herald of the bus made a visit to Pace HQ while it was passing through town.

Link to comment
Share on other sites

Pace looked at the same type of vehicle back in 2006, they have a 60 ft and 45ft version. Same as what is operating in LA Metro and Eugene. There was an article in the Daily Herald of the bus made a visit to Pace HQ while it was passing through town.

If the article was today and it was an NABI 60ft artic then it may be the same bus thats visiting us here tomorrow, I sure hope I get to ride it!

Link to comment
Share on other sites

There is a newspaper article in today's Redeye that shows new BRT's in the test phase in Cleveland. They show a picture of one of the buses. It has the BRT styling. The article claims the CTA is studying there planned rollout of BRT service in Cleveland. Well at least there buses look like BRT's. :P

They aren't "studying" they are implementing and it will be done in late fall/winter of this year. They completely rebuilt over 5 miles of street and added new landscaping. It looks very nice so far and it's not even done. Already the area it was built in has been having more interest in developing.

Link to comment
Share on other sites

They aren't "studying" they are implementing and it will be done in late fall/winter of this year. They completely rebuilt over 5 miles of street and added new landscaping. It looks very nice so far and it's not even done. Already the area it was built in has been having more interest in developing.

By they you sound like you mean Cleveland. I was referring to CTA studying Cleveland's plan. Wow!! what an impressive BRT network they are going to put out. We do need to study them. They have their own site euclidtransit.org in which they outline what they envision as there BRT network. They have videos outlining the plan. They have the special BRT vehicles that brings them the futuristic look of transit in the future. But if you look at their press releases, they have been working on this plan for years. At least it looks like it has been done right. CTA has alot of work to do to say the least. If Chicago can do as good a job as Cleveland they deserve to get the Olympics in 2016. This to me is the answer to the Olympic commitee's issues in saying that Chicago has a weak transportation system. They want to shuttle athletes around the city with ease. You could easily achieve this with this system and improve Chicago's traffic flow.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...