Jump to content

Construction at Bryn Mawr


Fails the Turing Test

Recommended Posts

The Bryn Mawr station sports some new plywood these days, around both ends of the escalator as well as a boxed-off area near the bike rack in the station house. Is this the start of the rehab and elevator addition promised by Alderman Osterman when the interim station rehabs were done last year?

Also in north Red news: The Uptown stations (Wilson, Lawrence, Argyle) are being bypassed by northbound trains on Saturday. Not sure if this is related to construction at Wilson, or if they're looking at the longstanding slow zone between Lawrence and Argyle.

Link to comment
Share on other sites

The Bryn Mawr station sports some new plywood these days, around both ends of the escalator as well as a boxed-off area near the bike rack in the station house. Is this the start of the rehab and elevator addition promised by Alderman Osterman when the interim station rehabs were done last year?

Probably something to do with repair of the escalator that broke over a week ago. Renovation of this station is still a ways off.
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...