Pace831 Posted November 8, 2017 Report Share Posted November 8, 2017 Most people in town know that the property surrounding the New Lenox Metra station was being "redeveloped". I have suspected for a while that demolition was part of the plan, but the "official" news didn't come until today: http://www.chicagotribune.com/suburbs/daily-southtown/news/ct-sta-save-nl-train-station-st-1105-20171106-story.html Quote Link to comment Share on other sites More sharing options...
Pace831 Posted November 10, 2017 Author Report Share Posted November 10, 2017 Save the Rock Island Depot.docx Here is a link to the petition started by the New Lenox Area Historical Society. If you know anyone in the area, please share this with them. It seems most people in town are still unaware. The forms can be mailed to: New Lenox Area Historical Society 205 W. Maple St. New Lenox, IL 60451 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted February 12, 2018 Author Report Share Posted February 12, 2018 Tribune: Thanks to the generosity of Walt Konow, the depot will be relocated and preserved. 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted April 11, 2018 Author Report Share Posted April 11, 2018 As evidenced by the above photo, utility work will begin soon. The date that the depot will be moved has not been announced yet. In related news, Fleckenstein's bakery pulls out of the redevelopment deal. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted May 7, 2018 Author Report Share Posted May 7, 2018 Construction started about 3 weeks ago, so I'm going to post pictures here as it progresses. The pictures in this post were taken during the past few months, showing the area before construction. About three years ago the Village of New Lenox bought and demolished four businesses along Route 30 for a new retail development to be built in conjunction with a new Metra station. At the time, the mayor said the old depot would be preserved and a new one would be built to the east. After a few delays in the planning process, it was announced last year that the depot would need to be demolished. The "justification" was that the utility lines to the building run under Church Street, which would be closed and torn up, so it would be too costly to relocate them. Metra, who owns the depot, also would not allow an unused building to remain so close to the tracks. The New Lenox Area Historical Society circulated a "Save the Depot" petition, collecting over 4000 signatures, and found a donor who was willing to have the depot moved to his property. The village government then agreed not to demolish the depot while allowing construction to begin nearby. This display inside the depot provides some historical reference: The same location in 2018. Note that Dickinson's Granary, built in 1852, still exists and is currently used for medical offices. The bridge over Hickory Creek (out of frame to right) has been replaced twice since the 1905 photo. Note the old baggage door on the east side of the building, replaced with a fixed wall with window but still distinctly visible. Looking southeast from Platform 2: Looking east from exit drive to Cedar Road: Looking north from Church Street: Looking northwest from parking lot: View to southwest from west side of depot, showing the corner of Route 30 and Cedar. The four businesses that were demolished were between Route 30 and the depot. Occupying most of the corner was the BP gas station, and Hutchins Cleaners was to its east along Church Street. View southeast to Church Street from same location: View to south along Church Street from the depot. Hutchins Cleaners was on the right, close to Route 30. House of Hughes (formerly Bruns) restaurant was on the left. Looking east from corner of Route 30 and Church. House of Hughes was in the immediate foreground, Pit Stop Tavern was behind the trees. Looking west from same location. Note the old lantern (near the tree) that stood at the entrance to Hutchins. Looking north at depot from same location: While I was photographing, two passengers got in an altercation while waiting for a delayed train. I called the cops to hopefully prevent them from getting on the train, and they both ran away when they heard the sirens. Here is the train arriving after that incident: 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted May 7, 2018 Author Report Share Posted May 7, 2018 Interior shots: The three doors from left to right are a restroom, storage area, and ticket office. Bay window area. The New Lenox Public Library has a book exchange set up. 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted May 7, 2018 Author Report Share Posted May 7, 2018 These photos were taken 4/29/18, two weeks in to construction. View northeast from Route 30/Cedar northeast corner: View east from west end of platform. The light poles along Platform 1 were removed so the depot can be moved along this path. At the street, it will be turned 90 degrees to head north on Cedar. The remaining light poles now have wires strung between them due to the utility lines under Church Street being cut. Construction trailer at west exit: Exit to Cedar Road closed April 30. A single lane of traffic can go past the depot to exit to Cedar Road. The parking areas closest to the building were removed. The bicycle rack was moved to the sidewalk along the south wall. ADA parking area east of depot: Looking south along where Church Street used to be: The closest parking is seen in the background. I took this picture on Sunday afternoon, so it was not very busy. On weekdays the lot is packed. View south from east side of depot: View southwest from east end of platform: Temporary ticket trailer and pay station for the parking lot behind it: Announcement on pay station: View northeast from southwest corner of Route 30/Church: View north from southeast corner of Route 30/Church: CVS Coming soon. Just what New Lenox needs. View northeast from southeast corner of Route 30/Cedar: A Sunday afternoon train heads toward the city after picking up a handful of passengers: 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted May 22, 2018 Author Report Share Posted May 22, 2018 Things don't look too different since the last set of photos. The construction work so far has been "underground", installing new utility lines. The immediate area around the depot has been closed off, which one guy apparently wasn't happy about last weekend. According to NLAHS, the depot would most likely be moved on June 5, 6, or 7, but that has not been finalized yet. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted June 4, 2018 Author Report Share Posted June 4, 2018 The depot was tentatively scheduled to move some time this week, but there has still not been an official announcement to confirm the date. They have certainly made a lot of progress toward that goal. Some equipment from the moving company (Wolfe House & Building Movers) was staged in the parking lot. They are currently digging under the building to place the beams and supports. The pallets in front of the yellow beams are bricks from the platform. So far they have dug out the sidewalks along the west and south sides of the building and cut a series of holes for the beams to be placed through. No digging along the north and east sides yet, but the platform bricks have been removed. The inside has been stripped of the wall tiles and all the concrete that was below the floor has been removed. This picture was taken through a hole in the west side of the building, below floor level. Note that on the far end you can clearly see how the old baggage door was bricked over. Looking through the window on the opposite side. The interior walls for the restroom, ticket office, and utility room are all gone. They are in the process of digging trenches for the beams that will be placed under the entire structure. Meanwhile, the foundation for CVS is being poured. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted June 10, 2018 Author Report Share Posted June 10, 2018 This week they dug out the remaining north and east sides, placed beams underneath, and wrapped two cables around the entire building that are attached to steel corner protectors. It is starting to look like it is almost ready to move. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 2, 2018 Author Report Share Posted July 2, 2018 6/17/18 In just one week they have finished removing the foundation and the entire building has been raised about 3 feet above its former level. At this point they are mostly just waiting for all the parties involved to coordinate a moving date, most likely July 10, 11, or 12. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 4, 2018 Author Report Share Posted July 4, 2018 7/2/18 Conditional moving date has been set: The wheels were put on the structure this week: Wheels and air brake lines underneath: A large box mounted on the south side. Air compressor? Truck from Wolfe parked on site: The depot will be pulled out through the remaining parking lot to Cedar Road: Then it will be turned 90 degrees for the trip up Cedar Road: The old depot is dwarfed by new construction: Route 30/Church becomes a right-turn-only intersection. The sidewalk on the north side of Route 30 has been reopened and CVS entrances installed: A view of the depot through the CVS structure: I chose the wrong position for what was probably the last chance to photograph IAIS 513 past the depot. The approach shot came out OK though: Quote Link to comment Share on other sites More sharing options...
Busjack Posted July 4, 2018 Report Share Posted July 4, 2018 17 minutes ago, Pace831 said: I chose the wrong position for what was probably the last chance to photograph IAIS 513 past the depot. The approach shot came out OK though: I guess that since the RI has been bankrupt for 40 years, nobody cares who uses its logo. Looks like a similar deal to the Don Orseno that IAIS runs on some former CRI&P tracks. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 9, 2018 Author Report Share Posted July 9, 2018 On Tuesday, July 3, the depot was moved away from the tracks and about 150 feet closer to Cedar Road. The steel plates below the wheels shown in the third photo of my last post were placed to assist with this short move. The move to Konow's farm had been scheduled for this Tuesday, July 10, but has been postponed until further notice due to an accumulation of water at the farm. In the last photo, note the gap below the bottom of the "door". Originally the bottom of the brick structure was at ground level. At some point (1964?) the platforms along three sides of the building and the floor inside were raised, which is why the "door" doesn't extend all the way to the bottom of the building. I believe this was done during the same renovation that the baggage door was covered, interior tile was installed, and the restroom was added. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 10, 2018 Author Report Share Posted July 10, 2018 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 24, 2018 Author Report Share Posted July 24, 2018 On Tuesday, July 17, the depot was moved to the east of its original location to allow space for the CVS construction. The wheels were removed from the structure so the mover can use them for other projects. A new moving date is expected to be announced soon. Quote Link to comment Share on other sites More sharing options...
Busjack Posted July 24, 2018 Report Share Posted July 24, 2018 1 hour ago, Pace831 said: On Tuesday, July 17, the depot was moved to the east of its original location to allow space for the CVS construction. The wheels were removed from the structure so the mover can use them for other projects. A new moving date is expected to be announced soon. I wonder to whom the sign was addressed. 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 24, 2018 Author Report Share Posted July 24, 2018 On 7/24/2018 at 9:07 AM, Busjack said: I wonder to whom the sign was addressed. The sign was put up on July 9, the day before the depot was supposed to have been moved. When the delay was announced the previous day, NLAHS made an effort to spread the word quickly so people wouldn't needlessly travel to New Lenox in hopes of witnessing the move. E-Z Sign Company of Mokena donated the sign to NLAHS. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 25, 2018 Author Report Share Posted July 25, 2018 Wednesday, August 15 has just been announced as the new moving date. Quote Link to comment Share on other sites More sharing options...
Pace831 Posted July 30, 2018 Author Report Share Posted July 30, 2018 On 7/24/2018 at 10:07 PM, Pace831 said: Wednesday, August 15 has just been announced as the new moving date. New sign covering the old one: On July 30, water main construction begins along North Cedar Road, which was an additional challenge in determining the moving date. Work will have to be suspended for the day of the move and any obstructions will need to have been cleared in advance. Additionally, ComEd crews will need to be present to raise wires along the route, which in some cases requires power to nearby buildings to be temporarily turned off. 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted August 16, 2018 Author Report Share Posted August 16, 2018 Today’s depot move was a success! I took hundreds of pictures and over 90 minutes of video, and I’ll post some on here once I go through them all to find the best ones. A huge thank you to the Konows and everyone at NLAHS for making this happen! 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted August 17, 2018 Author Report Share Posted August 17, 2018 Part 1 of 4 I arrived in New Lenox around 6:30 AM to view the advance preparations. An army of Metra workers was already on hand to take down the signals and protect the crossing. Train #410 rolls across Cedar Road after a momentary delay: Around 7:15, New Lenox Public Works blocked the road to general traffic. Measuring the height of the first wire that will need to be cleared: Almost ready to go, flags were put on display at both ends: The last train to pass the depot was #506 at 8:30 AM: With only a half hour before the next train was due, the depot was steered across the tracks and under the wires: Crossing the bridge over Hickory Creek: Crews got to work "restoring" the area immediately after the depot had passed. These village workers are reinstalling a sign on the road median: Quote Link to comment Share on other sites More sharing options...
Pace831 Posted August 17, 2018 Author Report Share Posted August 17, 2018 Part 2 of 4 Despite what the sign indicates, there was only room for one way traffic as the depot passes Oak Street entering the residential area: As seen from Gum Street, the depot passes Trinity Lutheran Church: NLAHS had a display set up under the blue tent in front of Oster-Oakview School: Passing by the church at Wood Street: Several stops were made for tree limbs to be cleared: The depot isn't the first building to move up Cedar Road. Ranch Frostie, a business locally famous for their ice cream, was once located about a block south of the depot's original location. After about 50 years, the buildings pass each other for the second time: Traffic signals had been taken down at the Francis Road intersection to allow the depot to pass through: Approaching Lenox Street, about to cross a wire that had been lowered to the ground: Many drivers on I-80 slowed down to look at the depot overhead: Curious residents came out to watch the depot pass Terry Ellen Lane: These Tollway workers have a great view of the depot crossing I-355: 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted August 17, 2018 Author Report Share Posted August 17, 2018 Part 3 of 4 The depot curves around the traffic signals at Southwest Highway: The crew gets ready to remove a wire from the road after the depot has cleared the intersection: Making a stop to refuel: The speed limit may have been 55, but 4 MPH was probably the top speed for the depot: There was about an hour delay at this location. The alleged reason was that the wires up ahead provided power to Silver Cross Hospital, which could not have its power supply interrupted. The crew used this break to eat lunch. While crossing the narrow Spring Creek Bridge, a sign had to be moved out of the way: A large crowd had gathered at the reverse curves at Bruce Road: Almost to the farm, the depot leans into the second curve: 1 Quote Link to comment Share on other sites More sharing options...
Pace831 Posted August 17, 2018 Author Report Share Posted August 17, 2018 Part 4 of 4 Turning off Cedar Road to enter the farm: The building rolls across the grass parking lot, finally free of clearance issues: Now oriented 180 degrees from its original position, at this point it was stopped before “reversing” into place: Walt Konow (left) poses with the depot: The depot’s final position in its new home on the farm. In the coming days it will be lowered onto its foundation. 1 Quote Link to comment Share on other sites More sharing options...