Construction started about 3 weeks ago, so I'm going to post pictures here as it progresses. The pictures in this post were taken during the past few months, showing the area before construction. About three years ago the Village of New Lenox bought and demolished four businesses along Route 30 for a new retail development to be built in conjunction with a new Metra station. At the time, the mayor said the old depot would be preserved and a new one would be built to the east. After a few delays in the planning process, it was announced last year that the depot would need to be demolished. The "justification" was that the utility lines to the building run under Church Street, which would be closed and torn up, so it would be too costly to relocate them. Metra, who owns the depot, also would not allow an unused building to remain so close to the tracks. The New Lenox Area Historical Society circulated a "Save the Depot" petition, collecting over 4000 signatures, and found a donor who was willing to have the depot moved to his property. The village government then agreed not to demolish the depot while allowing construction to begin nearby.

This display inside the depot provides some historical reference:

AA001.thumb.JPG.d8cd1f1811bf659b4181557141505a51.JPG

The same location in 2018. Note that Dickinson's Granary, built in 1852, still exists and is currently used for medical offices. The bridge over Hickory Creek (out of frame to right) has been replaced twice since the 1905 photo. Note the old baggage door on the east side of the building, replaced with a fixed wall with window but still distinctly visible.

AA002.thumb.JPG.86bf06fb7bcf8c016caf57b15871fc3a.JPG

Looking southeast from Platform 2:

DSCF2827.thumb.JPG.4701243cd4f802c83e843cdaa0068d5b.JPG

Looking east from exit drive to Cedar Road:

DSCF2830.thumb.JPG.d08708b1c99d72845ae1ee1b4f5ed0eb.JPG

Looking north from Church Street:

DSCF2832.thumb.JPG.927567b30f3b3e5a7d939d3fd7499d41.JPG

Looking northwest from parking lot:

DSCF2845.thumb.JPG.e8de9efb51e3ca354b769be073b5a9e7.JPG

View to southwest from west side of depot, showing the corner of Route 30 and Cedar. The four businesses that were demolished were between Route 30 and the depot. Occupying most of the corner was the BP gas station, and Hutchins Cleaners was to its east along Church Street.

DSCF2853.thumb.JPG.42c27288551a6c52645016fb29c0c0d4.JPG

View southeast to Church Street from same location:

DSCF2868.thumb.JPG.1e0953d639c2a0770f7ad21822920672.JPG

View to south along Church Street from the depot. Hutchins Cleaners was on the right, close to Route 30. House of Hughes (formerly Bruns) restaurant was on the left.

DSCF2928.thumb.JPG.78a34dc913313c0e84e77b43017dc591.JPG

Looking east from corner of Route 30 and Church. House of Hughes was in the immediate foreground, Pit Stop Tavern was behind the trees.

DSCF2838.thumb.JPG.4baa88e9f2c0a14d1b69cae6161ab07b.JPG

Looking west from same location. Note the old lantern (near the tree) that stood at the entrance to Hutchins.

DSCF2839.thumb.JPG.c73c48eedd3c0544f51907e9ff4cd531.JPG

Looking north at depot from same location:

DSCF2840.thumb.JPG.64b3383ddebf9abd6519ae8bae05e7c8.JPG

While I was photographing, two passengers got in an altercation while waiting for a delayed train. I called the cops to hopefully prevent them from getting on the train, and they both ran away when they heard the sirens. Here is the train arriving after that incident:

DSCF2933.JPG

  • Like 1
Link to comment
Share on other sites

These photos were taken 4/29/18, two weeks in to construction.

DSCF3078.thumb.JPG.4879eba0d1931c2aa847335425ed2a99.JPG

View northeast from Route 30/Cedar northeast corner:

DSCF3092.thumb.JPG.fea16ef1518a899df6a86e7e2653e632.JPG

View east from west end of platform. The light poles along Platform 1 were removed so the depot can be moved along this path. At the street, it will be turned 90 degrees to head north on Cedar. The remaining light poles now have wires strung between them due to the utility lines under Church Street being cut.

DSCF3098.thumb.JPG.21f5eb65d0c86fb46710a1fe60baf731.JPG

Construction trailer at west exit:

DSCF3099.thumb.JPG.737685e6d15f05e9c0e44399e82d26aa.JPG

Exit to Cedar Road closed April 30.

DSCF3101.thumb.JPG.76429027e8bbdc939de13a9a105d034b.JPG

A single lane of traffic can go past the depot to exit to Cedar Road. The parking areas closest to the building were removed. The bicycle rack was moved to the sidewalk along the south wall.

DSCF3104.thumb.JPG.d94489848092771f68b6bfbbc122ae08.JPG

ADA parking area east of depot:

DSCF3107.thumb.JPG.e6cf73ae30e007149f35770b20e12f54.JPG

Looking south along where Church Street used to be:

DSCF3110.thumb.JPG.94c2a80486f5ba6308394c3e792b8096.JPG

The closest parking is seen in the background. I took this picture on Sunday afternoon, so it was not very busy. On weekdays the lot is packed.

DSCF3120.thumb.JPG.519a2d33a36704dde3b15cd18493d797.JPG

View south from east side of depot:

DSCF3117.thumb.JPG.269d4b24094c74b41e88cbdac0dcd47e.JPG

View southwest from east end of platform:

DSCF3121.thumb.JPG.b209a123520c1a4a5e481b80636160af.JPG

Temporary ticket trailer and pay station for the parking lot behind it:

DSCF3124.thumb.JPG.437d5cc2acdf2f3673794af9a72130b2.JPG

Announcement on pay station:

DSCF3126.thumb.JPG.9561ee601833718c3df17379b6288307.JPG

View northeast from southwest corner of Route 30/Church:

DSCF3137.thumb.JPG.1424c5da132f58f26e70c49d2402a427.JPG

View north from southeast corner of Route 30/Church:

DSCF3142.thumb.JPG.f04b26ba97b8de4b27c85acd3f177851.JPG

CVS Coming soon. Just what New Lenox needs.

DSCF3146.thumb.JPG.f3d69b7f5c18942e0047d0dc28f4c38a.JPG

View northeast from southeast corner of Route 30/Cedar:

DSCF3152.thumb.JPG.ce1bf407d143a00183a542176304b61c.JPG

A Sunday afternoon train heads toward the city after picking up a handful of passengers:

DSCF3173.thumb.JPG.12bb803cc9e0ddde0f0a551ab22eae4c.JPG

 

 

 

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...

Things don't look too different since the last set of photos. The construction work so far has been "underground", installing new utility lines. The immediate area around the depot has been closed off, which one guy apparently wasn't happy about last weekend.

According to NLAHS, the depot would most likely be moved on June 5, 6, or 7, but that has not been finalized yet.

DSCF3184.thumb.JPG.115947cc009a5698d3c3bf43ca4817da.JPG

DSCF3186.thumb.JPG.8a44f05a374d836219d283c583663bc2.JPG

DSCF3187.thumb.JPG.9833acdfb35adbcd7455ee675cb546ab.JPG

DSCF3192.thumb.JPG.d842b1ebc028d04694dc4dc6523911b8.JPG

Link to comment
Share on other sites

  • 2 weeks later...

The depot was tentatively scheduled to move some time this week, but there has still not been an official announcement to confirm the date. They have certainly made a lot of progress toward that goal.

Some equipment from the moving company (Wolfe House & Building Movers) was staged in the parking lot. They are currently digging under the building to place the beams and supports. The pallets in front of the yellow beams are bricks from the platform.

DSCF3225.thumb.JPG.23fe41590d45c25d075a825c6b30ba70.JPG

DSCF3228.thumb.JPG.3494612631e5bd3b052e7cbe841675f6.JPG

So far they have dug out the sidewalks along the west and south sides of the building and cut a series of holes for the beams to be placed through.

DSCF3232.thumb.JPG.b99869b274739726041883aa12586341.JPG

No digging along the north and east sides yet, but the platform bricks have been removed.

DSCF3208.thumb.JPG.f2732996e46b0c9cc019829fabfe5363.JPG

DSCF3250.thumb.JPG.be35192461b48d4b7564d17f3e1d42fc.JPG

The inside has been stripped of the wall tiles and all the concrete that was below the floor has been removed. This picture was taken through a hole in the west side of the building, below floor level. Note that on the far end you can clearly see how the old baggage door was bricked over.

DSCF3233.thumb.JPG.ebdc70c525fd8e11d2502f7eea9c60dd.JPG

Looking through the window on the opposite side. The interior walls for the restroom, ticket office, and utility room are all gone.

DSCF3219.thumb.JPG.d1e0f3e3153a2deb1bcdfd0dd1fb9c49.JPG

They are in the process of digging trenches for the beams that will be placed under the entire structure.

DSCF3241.thumb.JPG.26c7fd6e9f0d63110ff73ca1e65bdee7.JPG

Meanwhile, the foundation for CVS is being poured.

DSCF3267.thumb.JPG.1cd97bface6d14777733e40c3e3a491c.JPG

 

Link to comment
Share on other sites

  • 3 weeks later...

6/17/18

In just one week they have finished removing the foundation and the entire building has been raised about 3 feet above its former level. At this point they are mostly just waiting for all the parties involved to coordinate a moving date, most likely July 10, 11, or 12.

DSCF3380.thumb.JPG.04ab6c7981f3fdb31350321f6fe3e038.JPG

DSCF3385.thumb.JPG.b576dd9d45a9d49d60d6c378a06228c9.JPG

DSCF3363.thumb.JPG.bb6dc49c9e68c00deae26c3959bed195.JPG

DSCF3362.thumb.JPG.d4d12bafa71a5649df0b5fb273d6eb15.JPG

DSCF3364.thumb.JPG.87b11f6d61bf082372cebc7edc796648.JPG

DSCF3384.thumb.JPG.5a6fe08ab3753698aeec61901f905460.JPG

DSCF3400.thumb.JPG.431b197b7a602b55f30d1a6427a12ad0.JPG

IMG_1095.thumb.JPG.8eba00eedd1b375e449a891bedd4daa8.JPG

Link to comment
Share on other sites

7/2/18

Conditional moving date has been set:

DSCF3552.thumb.JPG.a6244925aaec764546cfd17da5197386.JPG

The wheels were put on the structure this week:

DSCF3563.thumb.JPG.4567f457d8bc71c391c133d4f9b33797.JPG

Wheels and air brake lines underneath:

DSCF3600.thumb.JPG.06ae33fbb55c02d8a1ab7860af4fff23.JPG

A large box mounted on the south side. Air compressor?

DSCF3609.thumb.JPG.5f856b7b3ecd9f8bb02248fbb85703fc.JPG

Truck from Wolfe parked on site:

DSCF3566.thumb.JPG.665adf248d40ba6cecbdbe9358a0ba4a.JPG

The depot will be pulled out through the remaining parking lot to Cedar Road:

DSCF3588.thumb.JPG.c7ebca76ae242b7b2dd30e14e4d42c4d.JPG

Then it will be turned 90 degrees for the trip up Cedar Road:

DSCF3584.thumb.JPG.5c562aef85a45729271bf71f4c867590.JPG

The old depot is dwarfed by new construction:

DSCF3568.thumb.JPG.5dae9dd47966b09e5f0c3a4c37b39c28.JPG

Route 30/Church becomes a right-turn-only intersection. The sidewalk on the north side of Route 30 has been reopened and CVS entrances installed:

DSCF3579.thumb.JPG.0f8f62b07d1afe282cb5095ced8f5aae.JPG

A view of the depot through the CVS structure:

DSCF3581.thumb.JPG.1c525aff8b973db7413b93705ca2e188.JPG

I chose the wrong position for what was probably the last chance to photograph IAIS 513 past the depot. The approach shot came out OK though:

DSCF3652.thumb.JPG.e039fa8cc2fa64ac4fb83a7590751f51.JPG

 

Link to comment
Share on other sites

17 minutes ago, Pace831 said:

I chose the wrong position for what was probably the last chance to photograph IAIS 513 past the depot. The approach shot came out OK though:

I guess that since the RI has been bankrupt for 40 years, nobody cares who uses its logo. Looks like a similar deal to the Don Orseno that IAIS runs on some former CRI&P tracks.

Link to comment
Share on other sites

On Tuesday, July 3, the depot was moved away from the tracks and about 150 feet closer to Cedar Road. The steel plates below the wheels shown in the third photo of my last post were placed to assist with this short move. The move to Konow's farm had been scheduled for this Tuesday, July 10, but has been postponed until further notice due to an accumulation of water at the farm.

DSCF3664.thumb.JPG.79661298c1dffbee029cc654624bd8ae.JPG

DSCF3668.thumb.JPG.4cd3a811500feb74c20c949d71d6b0bc.JPG

DSCF3670.thumb.JPG.7964b4d088669d308ab38d535c34ba5e.JPG

DSCF3677.thumb.JPG.436e1bcc4aedb16999782f4cf5dd64be.JPG

DSCF3707.thumb.JPG.c5eac331e7fe42d081a4a3427f55d9f4.JPG

DSCF3717.thumb.JPG.55935591d93213416bb0f23f7b4afe86.JPG

In the last photo, note the gap below the bottom of the "door". Originally the bottom of the brick structure was at ground level. At some point (1964?) the platforms along three sides of the building and the floor inside were raised, which is why the "door" doesn't extend all the way to the bottom of the building. I believe this was done during the same renovation that the baggage door was covered, interior tile was installed, and the restroom was added.

Link to comment
Share on other sites

  • 2 weeks later...

On Tuesday, July 17, the depot was moved to the east of its original location to allow space for the CVS construction. The wheels were removed from the structure so the mover can use them for other projects. A new moving date is expected to be announced soon.

IMG_1483.thumb.JPG.ed68afcf2404d73119f43ad8671e9a01.JPG

Link to comment
Share on other sites

1 hour ago, Pace831 said:

On Tuesday, July 17, the depot was moved to the east of its original location to allow space for the CVS construction. The wheels were removed from the structure so the mover can use them for other projects. A new moving date is expected to be announced soon.

IMG_1483.thumb.JPG.ed68afcf2404d73119f43ad8671e9a01.JPG

I wonder to whom the sign was addressed.

  • Like 1
Link to comment
Share on other sites

On ‎7‎/‎24‎/‎2018 at 9:07 AM, Busjack said:

I wonder to whom the sign was addressed.

The sign was put up on July 9, the day before the depot was supposed to have been moved. When the delay was announced the previous day, NLAHS made an effort to spread the word quickly so people wouldn't needlessly travel to New Lenox in hopes of witnessing the move. E-Z Sign Company of Mokena donated the sign to NLAHS.

Link to comment
Share on other sites

On ‎7‎/‎24‎/‎2018 at 10:07 PM, Pace831 said:

Wednesday, August 15 has just been announced as the new moving date.

New sign covering the old one:

DSCF3874.thumb.JPG.c6e0f769fe1feb7b1a95d62393ff58c5.JPG

On July 30, water main construction begins along North Cedar Road, which was an additional challenge in determining the moving date. Work will have to be suspended for the day of the move and any obstructions will need to have been cleared in advance. Additionally, ComEd crews will need to be present to raise wires along the route, which in some cases requires power to nearby buildings to be temporarily turned off.

  • Like 1
Link to comment
Share on other sites

  • 3 weeks later...

Part 1 of 4

I arrived in New Lenox around 6:30 AM to view the advance preparations. An army of Metra workers was already on hand to take down the signals and protect the crossing. Train #410 rolls across Cedar Road after a momentary delay:

DSCF3960.thumb.JPG.1f010f72704503f524eadb8d80ec7ab1.JPG

Around 7:15, New Lenox Public Works blocked the road to general traffic.

DSCF3999.thumb.JPG.97772f3f34ea99b893584674be7b8eb3.JPG

Measuring the height of the first wire that will need to be cleared:

DSCF4044.thumb.JPG.182df72ae0faccba3e427c8f2e5d6251.JPG

Almost ready to go, flags were put on display at both ends:

DSCF4064.thumb.JPG.7b22e24177cbbda6af058358eb4ff1f1.JPG

The last train to pass the depot was #506 at 8:30 AM:

DSCF4070.thumb.JPG.a6559f872f0d1dcfe294c7a96fc67f7a.JPG

With only a half hour before the next train was due, the depot was steered across the tracks and under the wires:

IMG_1733.thumb.JPG.3ff4fcc8786d5fbd84fa349b87079956.JPG

Crossing the bridge over Hickory Creek:

DSCF4080.thumb.JPG.c3a6c504d8bab81b1eebe7cbae751641.JPG

Crews got to work "restoring" the area immediately after the depot had passed. These village workers are reinstalling a sign on the road median:

DSCF4103.thumb.JPG.aa42eff0d4a4337c7eb8912ee54bb426.JPG

Link to comment
Share on other sites

Part 2 of 4

Despite what the sign indicates, there was only room for one way traffic as the depot passes Oak Street entering the residential area:

DSCF4104.thumb.JPG.e74127065570f0b0b364547665a94a83.JPG

As seen from Gum Street, the depot passes Trinity Lutheran Church:

5095BB07-D236-4E4B-8AE8-D0CAFACC54AB.thumb.jpeg.6a828c12892f77d12f8a8666b3d0f94c.jpeg

NLAHS had a display set up under the blue tent in front of Oster-Oakview School:

DSCF4186.thumb.JPG.8dc95400483c12738a599faa8f762d9d.JPG

Passing by the church at Wood Street:

DSCF4214.thumb.JPG.0b0809ae5b508a4a97ebef43bfe60c0f.JPG

Several stops were made for tree limbs to be cleared:

DSCF4243.thumb.JPG.34d43981fe5a2bf80e0227b9c9e627d9.JPG

The depot isn't the first building to move up Cedar Road. Ranch Frostie, a business locally famous for their ice cream, was once located about a block south of the depot's original location. After about 50 years, the buildings pass each other for the second time:

DSCF4276.thumb.JPG.12bc467e48951a8556b43da973bbff2b.JPG

Traffic signals had been taken down at the Francis Road intersection to allow the depot to pass through:

DSCF4283.thumb.JPG.64896aa680f5cc54b10d70ccef7bb40e.JPG

Approaching Lenox Street, about to cross a wire that had been lowered to the ground:

DSCF4300.thumb.JPG.d17718570fce162fefefc0ba4aef3f13.JPG

Many drivers on I-80 slowed down to look at the depot overhead:

DSCF4325.thumb.JPG.2cde162d52261605f4f493cb6872dbb2.JPG

Curious residents came out to watch the depot pass Terry Ellen Lane:

DSCF4343.thumb.JPG.fb38cfb93d113b1571cef5d10edeeb64.JPG

These Tollway workers have a great view of the depot crossing I-355:

DSCF4401.thumb.JPG.6ff483b8b7b5e342443073a26fb47645.JPG

 

  • Like 1
Link to comment
Share on other sites

Part 3 of 4

The depot curves around the traffic signals at Southwest Highway:

DSCF4463.thumb.JPG.80ac5fb981b845ac543984b5cada8560.JPG

The crew gets ready to remove a wire from the road after the depot has cleared the intersection:

DSCF4464.thumb.JPG.e3192be64a724cbe2a714e563b07acae.JPG

Making a stop to refuel:

DSCF4496.thumb.JPG.7368a9f4a9c3955d4b9f000fdcc92e3a.JPG

The speed limit may have been 55, but 4 MPH was probably the top speed for the depot:

DSCF4557.thumb.JPG.bbcd407ac93da180bdd3019b90c1e941.JPG

There was about an hour delay at this location. The alleged reason was that the wires up ahead provided power to Silver Cross Hospital, which could not have its power supply interrupted. The crew used this break to eat lunch.

DSCF4570.thumb.JPG.7199b6ff46c07e70a82f85273cbc86bb.JPG

While crossing the narrow Spring Creek Bridge, a sign had to be moved out of the way:

DSCF4604.thumb.JPG.593b1db645347af1b9ba1ff1a354daae.JPG

A large crowd had gathered at the reverse curves at Bruce Road:

DSCF4634.thumb.JPG.3673a1bba5e742045aa6e745cbbbe413.JPG

Almost to the farm, the depot leans into the second curve:

DSCF4694.thumb.JPG.40af5921775a1e3ef27e036cc5e11361.JPG

  • Like 1
Link to comment
Share on other sites

Part 4 of 4

Turning off Cedar Road to enter the farm:

138ECC19-FD99-479A-A5A1-CF99BA8C901F.thumb.jpeg.cf131a7b48f1b7d090f7c8eb2fd3e712.jpeg

The building rolls across the grass parking lot, finally free of clearance issues:

D1D1C64D-23BD-4B90-B12F-0A9FFF31B477.thumb.jpeg.1dd0ff43979c77572c1ccf935c992c8c.jpeg

Now oriented 180 degrees from its original position, at this point it was stopped before “reversing” into place:

85FDED1F-DC0C-46CA-9D54-B21F6D0D3520.thumb.jpeg.7e113f751c7c7c8d6c6d47b92e863646.jpeg

Walt Konow (left) poses with the depot:

DSCF4748.thumb.JPG.f600387a27bd5ae5fe6fd8ab4b6c9c8e.JPG

The depot’s final position in its new home on the farm. In the coming days it will be lowered onto its foundation.

1EF3B7E0-7285-4D5C-A415-CE37052944A8.thumb.jpeg.f42e4a159d1fb5b5aae90e47b254f694.jpeg

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...