2 hours ago, artthouwill said:

assuming Bridgeview (Southwest) isn't large enough to handle that.

The assumption isn't that, but that something like 877, 888, and 895 would come back. Only thing that might be in play is a proposal to connect I-294 to Route 855 at Burr Ridge.

Link to comment
Share on other sites

  • 1 month later...

Pace Planning and Infrastructure Meeting ended up all over the place, but there were incidental mentions about the River and Wheeling garages, including that River would be expanded and initially would be part electric and part diesel. The main issue is money, and Metzger mentioned that a 135 bus garage (which would be Wheeling's size) might be something like $400 million (as opposed to what I believe was about $65 million for a CNG garage), and provisions for electrification are being made in the South Campus construction.

Link to comment
Share on other sites

  • 2 months later...

On the Project Zero page, Pace noted:

A new Northwest Division facility in Wheeling is being retrofitted to become a CNG fueling station. More than 100 low-emission buses will be operated from this garage by 2023

...

...the agency has also acquired land in Wheeling to replace its current Northwest Division, which will feature exclusive CNG technology among 115 new vehicles. ...

Nonetheless, Pace recognizes that both diesel and CNG are fossil fuels that produce greenhouse gas emissions. Moving forward, Pace will curtail new spending on diesel vehicles. Similarly, Pace will limit expansion of CNG technology to the current South and forthcoming Northwest Division operations.

So, it appears that despite a disappearance, the Wheeling Garage is back on. Unless work has been going on behind the scenes, it isn't going to be "by 2023," and some time in 2023 seems pretty aggressive. But this was taken from Driving Innovation; the Transition Plan says 2026-2027 for the 47 buses originally mentioned when the Board authorized the contract.

 

Link to comment
Share on other sites

  • 2 months later...
  • 6 months later...
  • 7 months later...
  • 1 month later...

At the Sept. Advisory Board Meeting, the question was raised whether the Wheeling garage construction was suspended, and the answer was yes, for the suspected reason that it was originally supposed to be CNG and they now don't know whether to electrify it. The question was also raised whether this means more maintenance (such as a new roof) at Des Plaines, for which the answer was also yes. But the presenter also repeated "I'm not the expert on this."

At the prior board meeting and here they said the South Campus office building was completed, but the   acceptance center was not, so Pace will be in South Holland for several more months. Metzger said at the board meeting that a training track was also complete there.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...