Busjack Posted August 20, 2017 Report Posted August 20, 2017 2 hours ago, Tcmetro said: I went and re-read the EA, and it sounds like the north terminal will be rehabilitated, not replaced To what I was referring, with respect to replacing the ugly box building was the "North terminal view in daylight - conceptual artist's rendering" on the CTA 95th project page. Between that and the gray steel, I didn't think that entrance would lead to a mechanical room, or whatever is south of the existing lobby. Quote
Busjack Posted August 21, 2017 Report Posted August 21, 2017 5 hours ago, Tcmetro said: I wonder what will happen to the 29 routing at the terminal once everything is complete. The diagram in the EA suggests that the north bus bridge will only be accessible from 95th and not from State/Lafayette. Assuming this is the case, and also that the north bus terminal still will operate clockwise, I don't see how hairpin U turns from Lafayette or to State are possible. However, the answer may be the south terminal. If it operates eastbound, it could be straight in and out. Since it would more likely run westbound (so the bus door faces the station), it could run Lafayette, left 95th, right terminal, right 95th and left State. A couple of more traffic lights, but possible. Quote
artthouwill Posted August 21, 2017 Report Posted August 21, 2017 2 hours ago, Busjack said: Assuming this is the case, and also that the north bus terminal still will operate clockwise, I don't see how hairpin U turns from Lafayette or to State are possible. However, the answer may be the south terminal. If it operates eastbound, it could be straight in and out. Since it would more likely run westbound (so the bus door faces the station), it could run Lafayette, left 95th, right terminal, right 95th and left State. A couple of more traffic lights, but possible. Which would also apply to Greyhound Quote
garmon757 Posted August 25, 2017 Report Posted August 25, 2017 Current progress! My son took the 5th and 8th shot! Quote
BusHunter Posted August 26, 2017 Author Report Posted August 26, 2017 Very good. At least we get a sense of what's going on!! Quote
Busjack Posted August 26, 2017 Report Posted August 26, 2017 Sticking someone on a head was not part of the contract. Quote
garmon757 Posted August 26, 2017 Report Posted August 26, 2017 4 hours ago, Busjack said: Sticking someone on a head was not part of the contract. Haha! Quote
garmon757 Posted September 6, 2017 Report Posted September 6, 2017 Well here I am around 5 AM and the northbound platform is almost back to its regular programming. Trains should be on that side very soon to begin work on the southbound platform. Also and key note, the entire Red Line is restricted from operating 4 cars during overnight hours until this project is complete. Quote
artthouwill Posted September 6, 2017 Report Posted September 6, 2017 2 hours ago, garmon757 said: Well here I am around 5 AM and the northbound platform is almost back to its regular programming. Trains should be on that side very soon to begin work on the southbound platform. Also and key note, the entire Red Line is restricted from operating 4 cars during overnight hours until this project is complete. I don't understand why 4 car trains can't run overnight unless capacity is restricted in 98th Yard. Quote
garmon757 Posted September 8, 2017 Report Posted September 8, 2017 On 9/6/2017 at 8:33 AM, artthouwill said: I don't understand why 4 car trains can't run overnight unless capacity is restricted in 98th Yard. Bingo! Quote
garmon757 Posted September 8, 2017 Report Posted September 8, 2017 Northbound platform is back to its regular scheduling program! Quote
artthouwill Posted September 8, 2017 Report Posted September 8, 2017 5 hours ago, garmon757 said: Northbound platform is back to its regular scheduling program! So is it the SB track's turn? How much longer before normal ops resume at 95th? The other day I rode a SB pm rush Red Line train destined for Ashland/63rd. I got off at Cermak McCormick. The train didn't have enough people to fill one car. Funny thing was that, even though the destination sign read Ashland/63rd, and the operator announced along with Mr CTA that the train was going to Ashland/63rd, there still passengers shocked when we approached Cermak. Fortunately they were only going to 35th so they wee o.k. I guess there are very few if any transfers from Red Line trains from Howard to south side Green Line trains. Thoug5 I like the supplement service, people are too entrenched in their travel ways for this to work outside of the 95th rebuild Quote
Busjack Posted September 8, 2017 Report Posted September 8, 2017 12 minutes ago, artthouwill said: Thoug5 I like the supplement service, people are too entrenched in their travel ways for this to work outside of the 95th rebuild Only reason CTA is doing it is because access to the 98th Yard is restricted, not that there is a sudden demand to go to Ray's Music Exchange, or even Whole Foods. These were essentially deadheads to begin with. Quote
artthouwill Posted September 8, 2017 Report Posted September 8, 2017 21 minutes ago, Busjack said: Only reason CTA is doing it is because access to the 98th Yard is restricted, not that there is a sudden demand to go to Ray's Music Exchange, or even Whole Foods. These were essentially deadheads to begin with. I understand that. My point is that when a viable alternative is presented at a given time, most riders do NOT take advantage of it. For example, I m sure there were plenty of riders that could've taken the Ashland Red Line trains which stop at 35th, 47th and Garfield, but chose to wait for the next 96th train. Quote
garmon757 Posted September 8, 2017 Report Posted September 8, 2017 @artthouwill and @Busjack I have to remove some of y'all posts to keep this topic relevant. Quote
andrethebusman Posted October 23, 2017 Report Posted October 23, 2017 So how are the buses still loading in the west terminal leaving? Via Lafayette? Andre Quote
garmon757 Posted October 23, 2017 Report Posted October 23, 2017 17 minutes ago, andrethebusman said: So how are the buses still loading in the west terminal leaving? Via Lafayette? Andre That's correct. Quote
garmon757 Posted October 23, 2017 Report Posted October 23, 2017 How to enter and exit on the eastern side. 1 Quote
garmon757 Posted October 31, 2017 Report Posted October 31, 2017 Current progress along with an exclusive look of the construction on the southbound station. Quote
BusHunter Posted November 8, 2017 Author Report Posted November 8, 2017 Passing by today. I was surprised they already have the steel part of the canopy up for the bus bridge. Quote
garmon757 Posted November 9, 2017 Report Posted November 9, 2017 On 11/7/2017 at 7:42 PM, BusHunter said: Passing by today. I was surprised they already have the steel part of the canopy up for the bus bridge. Last week. Quote
BusHunter Posted November 10, 2017 Author Report Posted November 10, 2017 Yeah the sb ryan traffic was really screwed up from 79th south. They have both directions down to 3 lanes. I wonder how long before the south bus bridge is done because all the buses are probably going to switch over so they can do the north side of 95th. The canopies seem to resemble the 35th street canopies. I thought Garfield has those too. That must be the official canopy of the Dan Ryan LOL!! Quote
andrethebusman Posted November 17, 2017 Report Posted November 17, 2017 In case nobody posted before, the remaining buses using the west terminal are leaving via State-91st-Lafayette-95th. Quote
Recommended Posts