Jump to content

Recommended Posts

Posted
2 hours ago, snailyards said:

Hi all! This article had a new render of what the Stadler Flirts coming to Metra soon will look like. It’s a nice read, too (for anyone who has a subscription or can bypass the paywall).

IMG_9737.jpeg

Welcome!

It's not a matter of if, but (1) when they're on the property and (2) in testing. Considering 2027 is around the corner, too. 

Posted

Here’s an article containing recent info on the logistics of the Flirts. I’ve listed some quotes that offer a quick summary of the updates:

“Metra put the expected range of a fully charged trainset at 45 to 65 miles. It said a charge from 20% to 80%, enough for the train to operate, should take roughly 20 to 30 minutes.”

“Stadler says the train stores energy in lithium-ion batteries on board, so it can run on non-electrified lines with no local emissions. It can top up from existing 480-volt cabling at yards and terminals or from dedicated chargers. Regenerative braking also returns energy to the batteries.”

”A two-car set will have 112 seats, and every added trailer car about 46 more. Boarding will be at low level, with lifts for ADA compliance.”

And, per Stadler, the expectation that Metra will be running service using the Flirts by 2028 remains. Exciting stuff.

Posted
12 minutes ago, snailyards said:

... “Metra put the expected range of a fully charged trainset at 45 to 65 miles. It said a charge from 20% to 80%, enough for the train to operate, should take roughly 20 to 30 minutes.”

“... It can top up from existing 480-volt cabling at yards and terminals or from dedicated chargers.

Since it says the line is 16.4 miles, that would be a 33 mile round trip, so unless the actual range is 70 miles, a charge is good for only one round trip. At the time the solicitation was advertised, there was a tour of the 47th St. Yard, but I don't know what good a charger would do there. I'm also not sure what the 480 volt cabling means--is it the plug-in head end power that Metra uses while trains are parked at the downtown stations? Some prior depictions showed a pantograph on the power unit extending to an overhead charger.

Posted
44 minutes ago, Busjack said:

Since it says the line is 16.4 miles, that would be a 33 mile round trip, so unless the actual range is 70 miles, a charge is good for only one round trip. At the time the solicitation was advertised, there was a tour of the 47th St. Yard, but I don't know what good a charger would do there.

Yep, so they’ll likely just charge the battery pack up between rounds at the termini.

49 minutes ago, Busjack said:

I'm also not sure what the 480 volt cabling means--is it the plug-in head end power that Metra uses while trains are parked at the downtown stations? Some prior depictions showed a pantograph on the power unit extending to an overhead charger.

You’ll have to ask the author or Stadler themselves for specifics, but it sounds to me that it is indeed the existing plug-in power available at yards and terminals. As for the pantograph animation you alluded to, it may have just been a proof of concept. Otherwise, new infrastructure will be required at both LaSalle St. and Blue Island - Vermont St. stations.

  • Thanks 1
  • 2 weeks later...
Posted

ABC7 story at 11:00 a.m. about the Stadler trainset at McCormick Place.

Of course, Brandon Johnson takes credit for something he had nothing to do about.

Posted
2 hours ago, artthouwill said:

 

YouTube video ( not mine) of Staddler built Metra battery electric train at APTA.

That's an excellent video. The thing I liked was the digital signage, which I believe should be retrofitted into the existing Metra and South Shore fleets, but won't.

The following shot taken from the video leaves open the previously debated question of what kind of coupler it has. (The promotional rendering had something that looked like a CTA coupler.)

image.thumb.png.3a316835e939f4660ac136aaab13315c.png

  • Upvote 2
Posted
7 minutes ago, Transit Introvert said:

I was there too.

Do you have any insights to share from your personal observation?

Posted
On 10/5/2026 at 7:20 PM, Busjack said:

That's an excellent video. The thing I liked was the digital signage, which I believe should be retrofitted into the existing Metra and South Shore fleets, but won't.

The following shot taken from the video leaves open the previously debated question of what kind of coupler it has. (The promotional rendering had something that looked like a CTA coupler.)

image.thumb.png.3a316835e939f4660ac136aaab13315c.png

For what it’s worth, I took a picture of the data plate on the coupler, so someone more knowledgeable than me may be able to draw some conclusions

IMG_3964.jpeg

  • Upvote 3
Posted
7 hours ago, Jstange059 said:

For what it’s worth, I took a picture of the data plate on the coupler, so someone more knowledgeable than me may be able to draw some conclusions

IMG_3964.jpeg

I magnified it enough that it is a Voith FAC Type 10. Google AI had this (link), but I'll leave it to someone more technically proficient to figure it out. Apparently it is a high-speed rail automatic coupler.

Posted

Per Metra:

Riders are invited to LaSalle Street Station to view the first of Metra’s new battery-powered trainsets from Stadler, which will be on display at the station for two days. The trainset will be on display at LaSalle St. Station on Wednesday, Oct. 14, from 10 a.m. to 6 p.m. and on Thursday, Oct. 15, from 8 a.m. to 6 p.m.

A public display!

Posted

I hit fast forward when the self-serving politicians took over, but it was clarified at the end that the train will be plugged in at each end of a trip.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...