On 3/16/2022 at 2:27 PM, Busjack said:

The board discussion on electric buses indicated that the electric buses are expected in the first or second quarter of 2023...

From the Sept 2025 Board meeting: Metzger said PhoenixEV said 4 buses are or are going on the line [not mentioned, out of 22]. On a more positive note, work at North is on schedule to be completed by the end of the year, with pantograph charging poles in place.

image.thumb.png.05a4216b1b293c2bd6c6ba60c84ce40a.png

Also, provision for electrification of SW division in next year's capital plan and an electric (and a diesel) bus going to Elk Grove Village for fire department training were mentioned.

  • 1 month later...
Posted
42 minutes ago, jtrussel said:

Looks like the one of the 2025 electric gillig is on pace property

And are you confusing the hybrid for the BEB? You need to provide more detail.

The Gillig BEB wasn't scheduled until into 2026

 

Posted
13 hours ago, jtrussel said:

Looks like the one of the 2025 electric gillig is on pace property

 

12 hours ago, Busjack said:

And are you confusing the hybrid for the BEB? You need to provide more detail.

The Gillig BEB wasn't scheduled until into 2026

 

Or do you mean the two demonstrators at SW? In the case of 20700, you're about 2 years late; in the other case, about 6 months off.

Posted
5 hours ago, Busjack said:

 

Or do you mean the two demonstrators at SW? In the case of 20700, you're about 2 years late; in the other case, about 6 months off.

Apologies had to watch the board meeting again it is a hybrid gillig

Posted
On 11/4/2025 at 9:08 AM, Busjack said:

 

Or do you mean the two demonstrators at SW? In the case of 20700, you're about 2 years late; in the other case, about 6 months off.

Does anyone know what the fleet number is for the second one?

  • 3 weeks later...
Posted
1 hour ago, jtrussel said:

So let's say North electric busses are successful there is surplus busses (at least half of North diesel fleet)that can go to west from north. North has about  52-53 6700s that given the routes they operate on definitely have way less miles then west 6300s as far as the highway Eldorados is there a plan to replace the now and with what I dont know 

 

 

The problemses are: with this theiry, with respect to electric buses are (1) the current construction at N is for 6 oe 12 electric buses, (2) the present plan is to test the electric buses in various areas, as, for instance 20700 is at SW and the other demonstrator is being used for training, and SW and R are on the priority list for electrification, and (3) nobody knows when or if the PhoenixEVs will be delivered.

I agree that the 6730s will eventually go somewhere else, but when or where is anyone's guess.

Posted
4 hours ago, Busjack said:

The problemses are: with this theiry, with respect to electric buses are (1) the current construction at N is for 6 oe 12 electric buses, (2) the present plan is to test the electric buses in various areas, as, for instance 20700 is at SW and the other demonstrator is being used for training, and SW and R are on the priority list for electrification, and (3) nobody knows when or if the PhoenixEVs will be delivered.

I agree that the 6730s will eventually go somewhere else, but when or where is anyone's guess.

I was under the impression that North was getting some of the gillig BEBs. I'm surprised pace is still on board with proterra/ Phoenix ev it's going to be 2040 by the time pace gets a full fleet of those LOL they should just give up on Phoenix and go gillig or new flyer For electrics

Posted
11 hours ago, jtrussel said:

I was under the impression that North was getting some of the gillig BEBs. I'm surprised pace is still on board with proterra/ Phoenix ev it's going to be 2040 by the time pace gets a full fleet of those LOL they should just give up on Phoenix and go gillig or new flyer For electrics

I get that but Proterra win the contract before selling to Phoenix and no one was sure what they would do.   Ultimately they promised to deliver the buses.  Supposedly they are being built and are supposed to start arriving in mod to late 2026.  Pace has elected to wait for these buses.   

Posted
2 hours ago, artthouwill said:

I get that but Proterra win the contract before selling to Phoenix and no one was sure what they would do.   Ultimately they promised to deliver the buses.  Supposedly they are being built and are supposed to start arriving in mod to late 2026.  Pace has elected to wait for these buses. 

I think you are confusing the 27 Gillig BEBs (JULY 2025 AGENDA) with the PhoenixEV ones. The Gilligs are to be delivered on approximately that schedule, after the 80 hybrids. At the Oct. 2025 meeting, Metzker said 4 PhoenixEVs were on the line, but it was noted here (at leasr) that the PhoenuxEVs were expected in June or Dec. 2024, and they are still not in sight.

I agree that Pace is waiting it out, but I would have declared a default by now.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...