So I passed by a sign that said the Damen entrance to the IMD stop will close on the 6th to make it accessible. To my surprise the same sign states the Paulina entrance is accessible now. So what did they do to make it accessible? Put up a wheelchair gate? If that is indeed the case then they could have a bunch of forest pk branch stations theoretically become accessible. So why don't they do that?

Yes, the rotogates were replaced with two wheelchair gates. A temporary agent booth opened as well, along with blue screening placed over the chain link fence on the ramp. 

 

20170202_211637.jpg

  • Upvote 2
Link to comment
Share on other sites

1 hour ago, Tcmetro said:

Yes, the rotogates were replaced with two wheelchair gates. A temporary agent booth opened as well, along with blue screening placed over the chain link fence on the ramp. 

Which raises the question whether this is temporary (from you picture, it looks it), although many of the Green Line/Lake stations were made accessible by using ramps. Maybe the Congress ramps are just too long.

Link to comment
Share on other sites

I seem to remember UIC' s Halsted ramp being completely rebuilt and putting stop gap level areas of the ramp so momentum can't pick up on a wheelchair and the wheelchair loses control and goes flying down the ramp. Those ramps are long and speed can really build up fast. Did anyone notice if this was done at Paulina?

Link to comment
Share on other sites

4 minutes ago, BusHunter said:

I seem to remember UIC' s Halsted ramp being completely rebuilt and putting stop gap level areas of the ramp so momentum can't pick up on a wheelchair and the wheelchair loses control and goes flying down the ramp. Those ramps are long and speed can really build up fast. Did anyone notice if this was done at Paulina?

The panel walls along the Paulina ramp are from the old Kostner station

Link to comment
Share on other sites

2 hours ago, BusHunter said:

I seem to remember UIC' s Halsted ramp being completely rebuilt and putting stop gap level areas of the ramp so momentum can't pick up on a wheelchair and the wheelchair loses control and goes flying down the ramp. Those ramps are long and speed can really build up fast. Did anyone notice if this was done at Paulina?

There hasn't been any work done to the physical structure of the ramp at Paulina. I'm speculating that the wheelchair gates were put in at Paulina so that Damen can be closed for stationhouse remodeling and reconstructing the ramp (which I would imagine would have landings added and perhaps widened like at Halsted). Then once Damen is reconstructed, Paulina could be closed and have the stationhouse and ramp worked on. I wonder how the Ogden stationhouse plays into the construction schedule. CTA's website states that they want to be finished by "late 2017", but they also started about four months later than what was stated. The Intergovernmental Agreement (because this project is funded with TIF money) states that construction needs to be finished by the end of 2018.

http://www.transitchicago.com/assets/1/agendas_minutes/016-104.pdf

http://www.transitchicago.com/imd/

Link to comment
Share on other sites

I dont know how wise that was then to put the wheelchair gates in with a long ramp. Paulina I think is one of the longest. You would think that poses a safety hazard. I would be very concerned if I worked in safety or the law dept. I wonder how they got around the handicapped inspection prior to opening it?

On the other hand if it's not an issue why not put those gates in at other forest park branch line stops. The stations could have wheelchair access even though it is generic.

 

Link to comment
Share on other sites

57 minutes ago, BusHunter said:

I dont know how wise that was then to put the wheelchair gates in with a long ramp. Paulina I think is one of the longest. You would think that poses a safety hazard. I would be very concerned if I worked in safety or the law dept. I wonder how they got around the handicapped inspection prior to opening it?

On the other hand if it's not an issue why not put those gates in at other forest park branch line stops. The stations could have wheelchair access even though it is generic.

 

Paulina might be the longest, but that probably makes it the least steep as well. Though I'm not sure if the duration of downhill rolling is more important than the intensity of downhill rolling.

I think putting wheelchair gates at all of the stations is fine unless they have only wheelchair gates. I personally prefer going through conventional turnstiles.

Link to comment
Share on other sites

 It all depends on the gravity of the object versus its friction. A 200 pound man could probably roll down that incline and pick up speed to about 15mph. Most likely though the wheelchair would hit the side of the ramp and scratch up a persons leg or turn over send them tumbling down the way.

a bike as a comparison over by me using the addison/narragansett hill can increase to about 20-25 mph. That would be a blocks duration about the same here although the incline is steeper.

You would think the uic halsted one wouldn't  be too safe either. The momentum could possibly take a runaway chair past the flat spots. I have some personal experience rolling my elderly relatives  in wheelchairs down ramps and you wouldn't  believe how much force pulls against you if youve done it. A petite woman could not do it if the person was big and heavy in the chair

I still have a new wheelchair in my garage. (Relatives passed a few years ago.) For an experiment we can roll busjack down the incline and see how fast he goes!! Lol!! Really though its probably not a laughing matter and if I was in a wheelchair I wouldnt use that incline for the fear i would travel down it like those kids in dumbass the movie!!

Link to comment
Share on other sites

5 minutes ago, BusHunter said:

For an experiment we can roll busjack down the incline and see how fast he goes!! Lol!!

Nope, but a thorough understanding of vectors and Newtonian acceleration calculus would. Unfortunately, that wasn't presented to me in an integrated manner in the 11th grade physics class, although I do recall it had to do with numbers squared (note that acceleration, including with respect to L motors, is expressed in units like miles per hour per second).

Link to comment
Share on other sites

You know if I was CTA i would put out a direct order that the CA assists anyone in wheelchairs up or down those ramps. I know it's policy a CA has to go and get a ramp for a wheelchair bound person to fill in the gap between trains and platforms but here they need to extend the rule. Only way to know is to ask a CA, only problem is last time when I was at Paulina it didn't have a CA, I believe only Damen and Ogden did. It might have one now because it doesn't take a pop quiz to know they are going to have fare jumpers now. I believe they had a rotogate before.

Link to comment
Share on other sites

9 minutes ago, BusHunter said:

because it doesn't take a pop quiz to know they are going to have fare jumpers now. I believe they had a rotogate before.

I was going to mention that in connection with @MTRSP1900-CTA3200's post, at least to the extent that someone could hold the handicap gate open, but then figured it was a risk at any accessible station.

 

BTW, the acceleration rate of gravity is 9.8 m/sec2 or 32 ft/sec2, but you would have to vector the angle of the ramp and take air resistance into account.

Link to comment
Share on other sites

And I was such a math/science geek in high school. :P Still love to play with numbers though. (I love doing people's taxes, already did mine, I do my relatives, but that's not my profession. I tell them you don't need a tax preparer as one year those guys didn't even claim my relative's house, you would be surprised the horror stories I've heard with identity theft at one such place I won't mention but it's the leading company, be protectful in who gets your SSN that's all I can say)

I was reading something that said an object on a 30 percent incline could travel at 4.5 meters per second. It's complicated I know, that's why professors lecture on stuff like this. I don't remember a question like that on my ACT test. The math part was fun.

Link to comment
Share on other sites

4 hours ago, Busjack said:

I was going to mention that in connection with @MTRSP1900-CTA3200's post, at least to the extent that someone could hold the handicap gate open, but then figured it was a risk at any accessible station.

 

BTW, the acceleration rate of gravity is 9.8 m/sec2 or 32 ft/sec2, but you would have to vector the angle of the ramp and take air resistance into account.

It's possible, but I don't see that happening for some reason. I was at Belmont after visiting a friend and I elected to go through a normal turnstile after watching someone go through the wheelchair gate. It looked like it didn't close that fast, even without human intervention.

I actually considered bringing that up in my original post, but I went on the assumption that the gates close by themselves.

Link to comment
Share on other sites

11 hours ago, MTRSP1900-CTA3200 said:

It's possible, but I don't see that happening for some reason. I was at Belmont after visiting a friend and I elected to go through a normal turnstile after watching someone go through the wheelchair gate. It looked like it didn't close that fast, even without human intervention.

I actually considered bringing that up in my original post, but I went on the assumption that the gates close by themselves.

What's bad about the gates is they have that blue handicapped button that allows someone to override the gate. What they really need is some kind of sensor on the gate like an electric eye that can track a person going the wrong way through a gate and when they go through announce they are fare evading like Pace does with its back door saying your too close. I think that would be ingenious because it shames the gate evader, tips off the CA if they are not around and possibly serves as a deterrent against this.

Link to comment
Share on other sites

  • 5 months later...

Since we last spoke of this particular station project here, I will report here that CTA announced in today under the most recent weekday service change updates that the Damen entrance to the Illinois Medical District station will finally reopen on next Friday, July 21st. Now CTA can soon remove the service alert announcements on the #50 Damen buses that the entrance is closed between February and May 2017 (yeah the original plan was that the entrance would only be closed till May xD). 

  • Upvote 1
Link to comment
Share on other sites

Damen entrance delayed until Monday morning. There was some final work being done plus CTA has weekend work going on at the IMD station itself resulting in one tracking of the Blue Line between Western and Halsted planned during the weekend.

Link to comment
Share on other sites

  • 1 year later...

CTA service alert for Ogden and Paulina has an end date of Monday, Aug. 20, 2018 now.

I walked past the other day and Paulina more or less looked ready to go while there was a little more work to be done at the Ogden house. I wonder if the elevator is ready for primetime.

https://www.transitchicago.com/travel-information/alert-detail/?AlertId=42220 

 

EDIT: This alert claims ADA accessibility at all three entrances, so the elevator is opening.

https://www.transitchicago.com/travel-information/alert-detail/?AlertId=51223

Link to comment
Share on other sites

On 8/15/2018 at 1:12 PM, Tcmetro said:

CTA service alert for Ogden and Paulina has an end date of Monday, Aug. 20, 2018 now.

I walked past the other day and Paulina more or less looked ready to go while there was a little more work to be done at the Ogden house. I wonder if the elevator is ready for primetime.

https://www.transitchicago.com/travel-information/alert-detail/?AlertId=42220 

 

EDIT: This alert claims ADA accessibility at all three entrances, so the elevator is opening.

https://www.transitchicago.com/travel-information/alert-detail/?AlertId=51223

Everything is almost ready except for the electricians finishing up the wires.

Link to comment
Share on other sites

  • 2 years later...

CTA gave a Capital Improvement Plan presentation at the CMAP Transportation Committee meeting on Dec 11 2020.

Several "Forest Park Phase 1" projects are funded as part of the Rebuild Illinois bond program.

  • Morgan Substation and Hermitage Traction Power Improvements ($50 M)
  • Racine Station ($33 M)
    • I listened in to the last CTA Accessibility Committee meeting and it was said that this station will get an elevator with the platform being extended towards the Racine bridge.
  • Halsted to IMD trackwork ($83 M)
  • Advance utility work ($12 M)

Page 5 of this PDF: https://www.cmap.illinois.gov/documents/10180/1110048/CTA_CIP_FY2021-2025_CMAP_final.pdf/31f48863-4ea0-263d-2472-5d0acd6c52d8?t=1607726249694

Link to comment
Share on other sites

  • 4 weeks later...

Found out what the delay is on the ike project. The state wants to make the ike a toll road complete with a hov lane and bus lane which would be the only free lane on the expressway. They want to charge 25 cents a mile in tolls. Critics say this will drive the traffic to nearby streets, which is what I think will happen or there will be a mass migration to I-55 or the kennedy. They claim the tolls will change based on how busy the ike is at the time. 

You know this is a golden opportunity for cta to cash in on  everyone's hardship with a fast "L" service. I would even see if they could possibly put an express track in cause in time that could be a mega corridor for them especially if they expanded out to Westchester. 

I was also reading this article. It states construction wont be done for 8 years!! So what in sam hill is CTA going to do with a line that cant run #5000s or #7000s? 8 years, that could be 2030 if construction started in 2022. Looks like we are going to find out what cta has up their sleeve. This must be the reason why they are doing a medical center/imd turnaround because they are going to be massively turning around if the blue becomes 5000s. There is a racine/blue line rehab coming that is going to add elevators to the stop so it will be a part of this rehab out to imd. What happens to service and roadbed west of Ind seems to be up un the air!! We shall see what will happen!!

 

https://www.illinoispolicy.org/idot-plans-to-build-a-new-toll-lane-on-the-eisenhower-expressway/

Link to comment
Share on other sites

42 minutes ago, BusHunter said:

Found out what the delay is on the ike project. The state wants to make the ike a toll road complete with a hov lane and bus lane which would be the only free lane on the expressway. They want to charge 25 cents a mile in tolls. Critics say this will drive the traffic to nearby streets, which is what I think will happen or there will be a mass migration to I-55 or the kennedy. They claim the tolls will change based on how busy the ike is at the time. 

You know this is a golden opportunity for cta to cash in on  everyone's hardship with a fast "L" service. I would even see if they could possibly put an express track in cause in time that could be a mega corridor for them especially if they expanded out to Westchester. 

I was also reading this article. It states construction wont be done for 8 years!! So what in sam hill is CTA going to do with a line that cant run #5000s or #7000s? 8 years, that could be 2030 if construction started in 2022. Looks like we are going to find out what cta has up their sleeve. This must be the reason why they are doing a medical center/imd turnaround because they are going to be massively turning around if the blue becomes 5000s. There is a racine/blue line rehab coming that is going to add elevators to the stop so it will be a part of this rehab out to imd. What happens to service and roadbed west of Ind seems to be up un the air!! We shall see what will happen!!

 

https://www.illinoispolicy.org/idot-plans-to-build-a-new-toll-lane-on-the-eisenhower-expressway/

It's just a proposal that won't go anywhere & the Illinois Policy Institute is the right wing of the extreme right wing. 

They're so far to the right, that right wing former governor Rauner hired some of them & then fired all of them after just a few months.

Link to comment
Share on other sites

I think the proposal that the IDOT study recommended was for a fourth lane west of Forest Park which would be a bus/toll lane. In the city, one of the four lanes would be converted to a toll lane. 

They did say the Oak Park rebuilding would take eight years, which is basically on par with the Circle Interchange project in terms of time. 

IDOT hasn't apportioned any money for the Ike, and I would imagine it's a few years out at best. 

Link to comment
Share on other sites

  • 7 months later...
1 hour ago, NovaBusFan said:

Seems like they have renewed the tracks replacing worn out rail and ties around the Forest Park terminal this weekend it’s good to see mini improvements at least until reconstruction actually starts on the Congress Branch of the line. Credits go to the owners of these two photos from Facebook.

D785F80B-91A5-4A09-AA99-9B13FD059A77.jpeg

243127A4-43F2-4B6A-8354-75B3FB159B83.jpeg

I rode the line today.  Obviously it is still slow between Forest Park and Harlem.   There is good speed between Harlem and Oak Park.   Between Oak Park and Austin there is good speed WB, but it's still a crawl EB.  Between Austin and Cicero is a crawl EB and WB crawls between Cicero and Central before picking up speed.   Between Cicero and Pulaski. The speed is moderate between Cicero and Kostner in both directions and slow from Kostner to Pulaski.   Overall. WB is faster than EB, with the next fastest stretch between Western end IMD.  The line doesn't speed up again until the subway past UIC.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...