jajuan Posted November 27, 2013 Report Share Posted November 27, 2013 I almost equate this to the time when you would have the X services, and people would flip out because the driver wouldn't let them off on a side street. Same as the the Brown/Purple fiasco: You see "loop" but you don't pay attention to the color. Bottom line is that people don't pay attention--this is universal and not limited to one side of the city. This might be a good time to at least change the sign codes to reflect the changes, but to also educate the potential changes that would happen to that route. Placement of that bus at the terminal will definitely need to be addressed. Not paying attention is not the same thing though as not comprehending, which is the thought that's implied by holding on to the statement that it's going to be confusing even after placement of that particular bus was addressed after that part of the equation was first posed for legitimate consideration. I pointed out that the current structure of the 71 is an already operating similar situation that a theoretical combining (or more correctly recombining in this case) of the 95W to the 95E would be if the 20 minute headway west of the 95th Street terminal were kept for coordination with the 381. And the current 71 structure of buses terminating at 73rd/Exchange alternating with buses making the full trip to 112th/Torrence seems to be working after a decade's time since the combining of the previous 71 route with the old 27 route because apparently the number of people comprehending the difference between which trip is which outnumbers the ones who just don't take time to pay attention when waiting for a bus between 69th/Red Line station and 73rd/Exchange. Quote Link to comment Share on other sites More sharing options...
garmon757 Posted October 19, 2014 Report Share Posted October 19, 2014 A shot of the breaking ground on behalf of the 95th Station Reconstruction. 1 Quote Link to comment Share on other sites More sharing options...
Juniorz Posted October 19, 2014 Report Share Posted October 19, 2014 A shot of the breaking ground on behalf of the 95th Station Reconstruction. Garmon757, will you keep a close eye on this station rehab? I've been keeping major tabs on the Your New Blue station rehabs and the Cermak-McCormick stations Quote Link to comment Share on other sites More sharing options...
garmon757 Posted October 19, 2014 Report Share Posted October 19, 2014 Garmon757, will you keep a close eye on this station rehab? I've been keeping major tabs on the Your New Blue station rehabs and the Cermak-McCormick stationsI'll keep an eye on this once or twice of month because of it being a 2+ year project. 1 Quote Link to comment Share on other sites More sharing options...
Juniorz Posted October 19, 2014 Report Share Posted October 19, 2014 Thank you, because i can't be everywhere at once Quote Link to comment Share on other sites More sharing options...
Busjack Posted October 19, 2014 Report Share Posted October 19, 2014 A shot of the breaking ground on behalf of the 95th Station Reconstruction. Could you specify the location of that shot. It sort of looks like the Dan Ryan southbound north of the I-57 split, but I'm not sure. I'm also not sure what the significance of the digging on the side of the expressway is, unless they have to move the ramps to make room for the station. Quote Link to comment Share on other sites More sharing options...
Juniorz Posted October 19, 2014 Report Share Posted October 19, 2014 Could you specify the location of that shot. It sort of looks like the Dan Ryan southbound north of the I-57 split, but I'm not sure. I'm also not sure what the significance of the digging on the side of the expressway is, unless they have to move the ramps to make room for the station. Yes the shot is near the I-57 split near the 98th yard and the digging has to due with the southern portion of the station. Currently, the terminal is located on the northside of 95th, but when completed, there will be a southern and northern terminal with a transfer bridge across 95th to avert customers from crossing the busy traffic along 95th Quote Link to comment Share on other sites More sharing options...
Busjack Posted October 19, 2014 Report Share Posted October 19, 2014 Yes the shot is near the I-57 split near the 98th yard and the digging has to due with the southern portion of the station. Currently, the terminal is located on the northside of 95th, but when completed, there will be a southern and northern terminal with a transfer bridge across 95th to avert customers from crossing the busy traffic along 95th Then the picture would have been taken on the Bishop Ford connector westbound. Anyway, the two overhead signs aren't clear enough for me to make out, even under magnification. Quote Link to comment Share on other sites More sharing options...
MTRSP1900-CTA3200 Posted October 19, 2014 Report Share Posted October 19, 2014 Could you specify the location of that shot. It sort of looks like the Dan Ryan southbound north of the I-57 split, but I'm not sure... That's correct. The tunnels for the Red Line to 98th Yard can be seen in the distance. Quote Link to comment Share on other sites More sharing options...
Sam92 Posted October 19, 2014 Report Share Posted October 19, 2014 Thank you, because i can't be everywhere at once I got you. I ride the 95E and the Red line to work lol Quote Link to comment Share on other sites More sharing options...
garmon757 Posted October 20, 2014 Report Share Posted October 20, 2014 Could you specify the location of that shot. It sort of looks like the Dan Ryan southbound north of the I-57 split, but I'm not sure. I'm also not sure what the significance of the digging on the side of the expressway is, unless they have to move the ramps to make room for the station.You are correct my friend. I took this shot on the 95th Steeet bridge in between the fence holes. Quote Link to comment Share on other sites More sharing options...
i8itall4u Posted October 20, 2014 Report Share Posted October 20, 2014 It's 2014 and construction for the totally new terminal is off and running. Pull out your cta maps class and look at every other rail terminal in the system and tell me what's missing from present and future plans for 95th? Quote Link to comment Share on other sites More sharing options...
Busjack Posted October 20, 2014 Report Share Posted October 20, 2014 You are correct my friend. I took this shot on the 95th Steeet bridge in between the fence holes. At least I am now properly oriented. I guess you are implying that the structure for the bus bays is going to span the expressway. Quote Link to comment Share on other sites More sharing options...
ctrabs74 Posted October 24, 2014 Report Share Posted October 24, 2014 It's 2014 and construction for the totally new terminal is off and running. Pull out your cta maps class and look at every other rail terminal in the system and tell me what's missing from present and future plans for 95th? Hmmm... Isn't there something taking place in the City of Chicago within the next few months... Something about an election or something? Quote Link to comment Share on other sites More sharing options...
garmon757 Posted October 24, 2014 Report Share Posted October 24, 2014 I guess you are implying that the structure for the bus bays is going to span the expressway. Correct. If I'm not mistaking, it supposed to have one bay on each side of 95th. Quote Link to comment Share on other sites More sharing options...
Busjack Posted October 24, 2014 Report Share Posted October 24, 2014 Correct. If I'm not mistaking, it supposed to have one bay on each side of 95th. True. The emphasis is essentially a headhouse and bus terminal on both sides of 95th and a pedestrian bridge between them. Quote Link to comment Share on other sites More sharing options...
garmon757 Posted July 19, 2015 Report Share Posted July 19, 2015 Haven't talked about this in a while. Not that much of progress going on though. 2 Quote Link to comment Share on other sites More sharing options...
NewFlyerMCI Posted July 20, 2015 Report Share Posted July 20, 2015 Looks like their making faster progress than this Silver Spring transit Center we were supposed to have a few year back... Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 20, 2015 Author Report Share Posted July 20, 2015 It takes time. Obviously those circular piers in Garmon's photos are going to support the bus deck on the south side of 95th. They probably want to build that first get all the current buses using the north side bridge over there and then demolish and reconstruction the north side. Sounds like a mini Hubbard's Cave for the Ryan is in the works. That whole 8-10 car section will be tunnelized and maybe even a section beyond that, maybe a good 400-500 ft. The station will be so elaborate when it's done, it looks like it should be at an airport. 2 Quote Link to comment Share on other sites More sharing options...
Juniorz Posted July 20, 2015 Report Share Posted July 20, 2015 They are also finishing awarding additional contracts for the project, which should be awarded before the end of summer. 2 Quote Link to comment Share on other sites More sharing options...
MTRSP1900-CTA3200 Posted July 20, 2015 Report Share Posted July 20, 2015 And of course I can't wait for the finished product! Construction updates are always awesome. Thanks! 2 Quote Link to comment Share on other sites More sharing options...
Busjack Posted June 18, 2016 Report Share Posted June 18, 2016 Sun-Times article about the recent unveiling of the final design and debate about "all that red." The big, squared canopies over the doors to the bus bays seem to me to be the bold statement, though. Quote Link to comment Share on other sites More sharing options...
trainman8119 Posted June 18, 2016 Report Share Posted June 18, 2016 'splain this one to me Lucy !!! This project has been in progress for about a year now...AND THEY ARE FIRST SHOWING ARTIST RENDERINGS NOW ????? 3 Quote Link to comment Share on other sites More sharing options...
MTRSP1900-CTA3200 Posted June 18, 2016 Report Share Posted June 18, 2016 47 minutes ago, trainman8119 said: 'splain this one to me Lucy !!! This project has been in progress for about a year now...AND THEY ARE FIRST SHOWING ARTIST RENDERINGS NOW ????? They've had renderings for a while, but the one posted is the final design for the structure. Garmon757 also posted pictures of construction work that has taken place as well. Quote Link to comment Share on other sites More sharing options...
artthouwill Posted June 18, 2016 Report Share Posted June 18, 2016 I initially thought that the platform would be extended south to accommodate entrance from the new south station house. However, the article mentioned a pedestrian bridge over 95th Street to connect the two terminals. Unless the weather is extreme, no one really wants to go upstairs to cross a bridge then go 2 stories down to catch a train. Quote Link to comment Share on other sites More sharing options...