On 11/4/2017 at 5:12 PM, BusHunter said:

When the sunnyside entrance opens I'll go back and take a final photo op of the station. Trouble is I don't know when that is.happening!! 9_9

They were still working on it yesterday looks to be done for the most part.

Share this post


Link to post
Share on other sites

Tribune architectural review of the station, mostly favorable. Also this seems to be the first reference that all 4 tracks are in service.

Share this post


Link to post
Share on other sites
6 hours ago, Busjack said:

Tribune architectural review of the station, mostly favorable. Also this seems to be the first reference that all 4 tracks are in service.

That is confirmed! I went by there this morning. Southbound Red Line trains are back to operating track #2 south of Wilson. 

Share this post


Link to post
Share on other sites
19 hours ago, garmon757 said:

That is confirmed! I went by there this morning. Southbound Red Line trains are back to operating track #2 south of Wilson. 

Yeah, I should have mentioned on Wednesday when I rode through all four tracks were in operation.

Share this post


Link to post
Share on other sites

I have been catching up on this thread. Thanks for all the great pictures and videos.

 

I ride the Red line south from Howard every day around the time the Purple line express starts in the morning. The new service pattern is perfect.

The Purple line train (that my Red line train previously had to wait to pass at Lawrence if all was on schedule) now does an across the platform rendezvous at Wilson.

South of Wilson, Purple passes Red at Sheridan. Rendezvous again at Fullerton.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

  • Similar Content

    • By BusHunter
      There is an article today that talks about the brown line flyover. I'm surprised they have to demolish up to 16 houses for this? Can't they just build over the existing structure?
       
      http://www.dnainfo.com/chicago/20140417/lakeview/ctas-belmont-station-bypass-16-lakeview-buildings-needed
    • By newport
      (starting a new thread since this topic really didn't fit under the Red-Purple Modernization thread)

      It looks like the Dan Ryan branch track project is going to roll out as someone else originally projected many weeks ago – a complete shutdown of the south branch of the Red Line from just south of Roosevelt to 95th. Subsequent to that post, I had heard that the CTA was going to offer a second option of weekend-only work for 4 years, but that the preferred plan was the complete 5-month shutdown. They had decided to present the second, weekend-only option, in order to give the appearance that they were offering the community and aldermen an option.

      Well, it now looks like the weekend-only closures option is not seriously being considered. They are going with the complete shutdown plan. The complete Dan Ryan branch shutdown will begin in spring 2013 and last through the summer.

      The details are basically as Mayfield laid out weeks ago:
      Red Line will shut down completely from south of Roosevelt station to 95th in spring 2013 The shutdown will continue for 5 months Southbound Red line trains will be rerouted to Green line tracks after stopping at Roosevelt and will serve all Green line stops to Ashland/63rd Express bus shuttles will run from Garfield Green station to 63rd, 69th, 79, 87th, and 95th Red. there will be other additional supplemental bus service
      One thing that changed since Mayfield outlined this plan is that the CTA intends to offer some free and discounted fares to some riders affected by the shutdown. This helped to ensure the support of the aldermen, at least in one office I am aware of. Not sure of the extent of these free fares. This is still under discussion. I heard possibly free shuttle buses and free fares boarding at Garfield Greenline station.

      Also, the CTA has reached out to and received the support of the Chicago Urban League (for support on hiring issues?). As I hear it, the big selling point is the number of jobs this project will create.

      This information is for your information and discussion. I have no official proof I will post, and no official sources I will identify. Doing so would probably cut off my source of info.
      .

    • By BusHunter
      I took a few pictures of the Clark/Division station on the Red line. At street level, on Lasalle, they already have concrete staircases in place and the big hole over Division has been filled. Looks like they want to open up the street for November. At platform level, they have now opened up an area on the east side of the station and we can now see the decorative ceiling tiles they are installing. They also have one light bar installed, and the marble sheeting on the floor of the station in that section. (pictures from left to right are: Lasalle SE corner, Lasalle NE corner, station ceiling, station lightbar, station floor)




    • By sw4400
      I'm trying to follow the logic about the CTA wanting to extend the Red Line to 130th via a shared elevated embankment with a Union Pacific Freight Line. Are they saying that they will lay third rail next to existing freight tracks and share said tracks with a freight line? Initially, I thought not and that would be impossible, but when you put "share" in the context, that changes the meaning.

      If this is being read correctly, does the CTA realize what kind of delays they are in for from 95th to 130th? Freight Trains can be anywhere from 100-200 cars in length and cause "Freight Delays" on all Metra lines where Metra and Freight co-exist.

      Story
    • By Kevin
      There was some discussion on CTA Tattler today regarding the upcoming Red & Purple Modernization Project public scoping meetings.

      There are more details about all of the proposed alternatives in the Notice of Intent filed with the FTA. (Credit to Hugh Bartling for finding this document.)

      First, there's the "No Action Alternative" which would do nothing. The "Basic Rehabilitation Alternative" would essentially put lipstick on a pig, while the "Basic Rehabilitation with Transfer Stations Alternative" would add Purple Line transfer stations at Wilson and Loyola.

      Both the "Modernization 4-Track Alternative" and "Modernization 3-Track Alternative" would permanently close four stations: South Blvd, Jarvis, Thorndale, and Lawrence. Both of these options would replace the existing structure and embankment with "modern concrete aerial structure" while also rebuilding most stations. The 3-Track option would allow for Purple Line Express service in only a single direction.

      The "Modernization 2-Track Underground Alternative" would replace most of the existing Red Line structure with a two-track subway. Trains would transition below ground after Belmont, following the Brown Line tracks and then running under Sheffield/Sheridan to the intersection of Sheridan and Broadway, where they would then run under Broadway until returning to elevated just north of Loyola. Subway stations would be constructed at Addison, Irving Park, Wilson, Foster, Bryn Mawr, Glenlake, and Devon/Loyola. Purple Line Express service would be discontinued in favor of more frequent local service. I created a map of what this proposed subway portion would look like. (Not that I actually expect this to ever get built.)

      Public meetings will be held in Uptown, Edgewater, Rogers Park, and Evanston next week to get input on the alternatives.
×