Brown line Flyover breaking ground


BusHunter

Recommended Posts

  On 8/30/2021 at 10:41 PM, Mr.NewFlyer1051 said:

there are bus shuttles between belmont and southport starting weekend of September 10th 3 weekends it looks like 

Expand  

It should be done before the winter. They need to take advantage of labor day weekend. Was noticing on the west end theres a place for a substation but there is no substation yet. Maybe that's the September work. They are going to have to install an interlocking right there at the Belmont station. That looks like more than 3 weeks work. Probably a substation will have to go there as well. 

Link to comment
Share on other sites

  On 8/31/2021 at 1:37 AM, BusHunter said:

It should be done before the winter. They need to take advantage of labor day weekend. Was noticing on the west end theres a place for a substation but there is no substation yet. Maybe that's the September work. They are going to have to install an interlocking right there at the Belmont station. That looks like more than 3 weeks work. Probably a substation will have to go there as well. 

Expand  

yea they are doing some kenmore interlocking work thru september 

Link to comment
Share on other sites

  • 2 weeks later...
  • 3 weeks later...
  On 10/5/2021 at 6:34 PM, Mr.NewFlyer1051 said:

extreme progress will be done this coming weekend and next as the brown line will be suspended between southport and belmont i think the new interlocking will be put in place at the west end of the flyover and then slide in work for the south end of the bypass

Expand  

So is 6 flags great Belmont almost done? 

  • Haha 4
Link to comment
Share on other sites

  On 10/5/2021 at 6:34 PM, Mr.NewFlyer1051 said:

extreme progress will be done this coming weekend and next as the brown line will be suspended between southport and belmont i think the new interlocking will be put in place at the west end of the flyover and then slide in work for the south end of the bypass

Expand  

Uh oh we are almost done?

Link to comment
Share on other sites

  • 2 weeks later...

Update as of 10/17/21:

This weekend and the weekend of 10/22/21 crews are connecting the north end of the bypass.

In 3 weeks they will connect the south end of the bypass there will be no suspensions all northbound trains will use northbound red line tracks thru the area of belmont for 2 weeks 

Bypass should be completed and in full use end of november 

  • Like 1
Link to comment
Share on other sites

  • 2 weeks later...
  On 10/27/2021 at 1:02 AM, artthouwill said:

Message says we could not locate the video you are trying to view.

 

 

Expand  

Hmm, no clue why it's doing that. Everything else I uploaded today was fine and it worked on mobile. Oh well.

Track 2 (or whatever the 2 track from the right/east is) was out of commission (all the maintenance equipment). They're rebuilding the supports for the track and switchover in between the flyover and Belmont station

Link to comment
Share on other sites

  • 2 weeks later...
  On 11/8/2021 at 3:28 PM, BusHunter said:

Hmm the flyover is open??? What about all the testing they said they were gonna do?

 

Screenshot_20211108-092626_Samsung Internet.jpg

Expand  

https://www.transitchicago.com/travel-information/railstatus/?Page=Upcoming

Can't find that status alert on the current or upcoming service changes. Only alert for the Brown Line is the boarding change at Belmont.

Link to comment
Share on other sites

  On 11/8/2021 at 4:10 PM, Policeman said:

They said forget the testing ??

Expand  

They promised it would be open on Monday. I knew they were gonna push it back. There’s a third rail piece needed to be back in place and there’s a column that needed to be placed underneath the flyover, they have to clean up all what was down there.

Link to comment
Share on other sites

  On 11/9/2021 at 12:01 AM, NovaBusFan said:

They promised it would be open on Monday. I knew they were gonna push it back. There’s a third rail piece needed to be back in place and there’s a column that needed to be placed underneath the flyover, they have to clean up all what was down there.

Expand  

Remember the people mover was supposed to open too but it took them 3 years. I wonder why the old cars are still at taft ave and irving park at the south end of the airport. (Just in case???) ???

Latest gossip says it will open next week. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...