jajuan Posted May 26, 2017 Report Share Posted May 26, 2017 On 5/17/2017 at 1:01 PM, Busjack said: On this and your prior comment about "The only part not really being done is over Broadway and points north" they probably have to shut down Broadway to continue. Did they when the erected the big beam over Broadway to the pillar on the east sidewalk? There were a few weeknights and weekends that Broadway was closed and the #36 had to be detoured to Sheridan, yes. 1 Quote Link to comment Share on other sites More sharing options...
BusHunter Posted May 29, 2017 Author Report Share Posted May 29, 2017 I have a new update to upload on this. Maybe ill upload it tomorrow. Celebrating memorial day today. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted May 30, 2017 Author Report Share Posted May 30, 2017 21 hours ago, BusHunter said: I have a new update to upload on this. Maybe ill upload it tomorrow. Celebrating memorial day today. Ok here is the updated flyby for yesterday 5/29/17. https://www.youtube.com/watch?v=KWFpZ4vlsV8&feature=youtu.be Mostly what has changed is the addition of more rebar in prep for the concrete pour of track 4. They are also shoring up more track on track 4. Looks as if they might be trying to concrete most of track 4 at the same time. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted June 6, 2017 Author Report Share Posted June 6, 2017 Here's my updated flyby for 6-5-17. https://www.youtube.com/watch?v=1yjmfabee3o They continue to work on the rebar but they have now installed the steel over Wilson plus they have progressed on the new north side entrance and the main stationhouse entrance now installing the frame that will soon hold the glass for the glass entrance. I've included a few shots of that here. They continue to work on the sunnyside entrance plus they have installed some more steel toward the south entrance to the new structure Quote Link to comment Share on other sites More sharing options...
TransitXan17 Posted June 11, 2017 Report Share Posted June 11, 2017 Click Here! for an update on the Wilson Station Reconstruction (as of 6/10/17). Construction is going pretty well! Quote Link to comment Share on other sites More sharing options...
BusHunter Posted June 12, 2017 Author Report Share Posted June 12, 2017 I'll upload to YouTube what i captured this week either tonight or tomorrow. They have cemented now most of the existing structure and the rest has the rebar on it north of wilson. Theres a sea of 18 wheel flatbeds parked without cabs at the north end of the structure. about 6. And then i spied a couple more driving around so thats a good 8-9 spans. They were welding on the existing structure trying to get those pieces in place so there must be a broadway shutdown in the works. Wilson was closed to vehicular traffic but i couldnt really determine why. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted June 13, 2017 Author Report Share Posted June 13, 2017 Here's the flyby video I shot yesterday of the Wilson reconstruction. Here's some shots of the trucks with steel on them waiting for installation. I count about 9 spans with 1 being installed to make 10 spans. Here's a few shots from the platform. And a shot of the north entrance taking shape. 3 Quote Link to comment Share on other sites More sharing options...
BusHunter Posted June 20, 2017 Author Report Share Posted June 20, 2017 Here is the updated Wilson Flyby for June 19th. https://youtu.be/eqrK_LCkhVA They have done quite a bit of concreting, all the spans that were on broadway last week have been installed. The escalator has been installed, (notice the blue tarp) as well as more steel has been installed for the station itself. 1 Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 4, 2017 Author Report Share Posted July 4, 2017 Here my latest flyby from 6-27-17. I haven't been able to upload it due to a busy week. With a little luck maybe i can shoot a July 4th flyby. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 5, 2017 Author Report Share Posted July 5, 2017 I'll be uploading my july 4th flyby later on tonight. Didnt get the chance to last night. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 5, 2017 Author Report Share Posted July 5, 2017 5 hours ago, BusHunter said: I'll be uploading my july 4th flyby later on tonight. Didnt get the chance to last night. OK guys here it is. https://youtu.be/lPMQHbmIfNE Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 11, 2017 Author Report Share Posted July 11, 2017 Ok here's my flyby of Wilson for 7/10/17. Really amazing they are practically done with the concrete structure and canopy. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 19, 2017 Author Report Share Posted July 19, 2017 Here is my Wilson Red line flyby for 7-18-17. Things worked on this week includes the completion of the steel structure up at the north end. Tracks are being laid at the south end of the structure as well as on the connecting structure to the mainline. The concrete structure is now complete up by Broadway but it still needs ties. Looks like they will be done with this project in about a month or two. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 27, 2017 Author Report Share Posted July 27, 2017 Here's this week's flyby at Wilson. Tracks are now done from the south end with the steel up to broadway but still needs a third rail installed. The steel that is to hold the noise abatement wall on the outside of track 4 has been installed from the south end of the concrete structure up to Wilson. The canopy is now complete and awaiting the glass roof installation. Glass is on the platform. Steel shelters have all been installed on the platform and are awaiting completion. Tracks have been installed this week from Wilson to the end of the concrete structure at broadway. The north steel structure still lacks the ties and tracks and looks to be the last remaining big piece they have to install. Quote Link to comment Share on other sites More sharing options...
Busjack Posted July 27, 2017 Report Share Posted July 27, 2017 2 hours ago, BusHunter said: Tracks are now done from the south end Looks like the potential ski jump behind Target has been addressed, but they'll still have to put the junction there. Quote Link to comment Share on other sites More sharing options...
Tcmetro Posted July 29, 2017 Report Share Posted July 29, 2017 According to the CTA alert, the north entrance will be opening 12 AM Sunday (tonight), and the temporary entrances will be closed. http://www.transitchicago.com/travel_information/alert_detail.aspx?AlertId=42402 Quote Link to comment Share on other sites More sharing options...
Juniorz Posted July 29, 2017 Report Share Posted July 29, 2017 2 hours ago, Tcmetro said: According to the CTA alert, the north entrance will be opening 12 AM Sunday (tonight), and the temporary entrances will be closed. http://www.transitchicago.com/travel_information/alert_detail.aspx?AlertId=42402 Access to the temporary north auxiliary has been terminated since Friday afternoon. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 31, 2017 Author Report Share Posted July 31, 2017 I'll take some pictures when I head over there tomorrow. Quote Link to comment Share on other sites More sharing options...
Juniorz Posted July 31, 2017 Report Share Posted July 31, 2017 Wilson station Grand Opening Date: September 11th. Quote Link to comment Share on other sites More sharing options...
Busjack Posted July 31, 2017 Report Share Posted July 31, 2017 1 minute ago, Juniorz said: Wilson station Grand Opening Date: September 11th. Will there be adult beverages? Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 31, 2017 Author Report Share Posted July 31, 2017 29 minutes ago, Juniorz said: Wilson station Grand Opening Date: September 11th. Damn knew they were close but not that close. Do you think this is a full grand opening or a grand opening with 3 tracks? i'll have to check them out today, but based on last week I don't see them putting in ties and tracks from broadway north, 3rd rail on the whole track 4, connecting both ends of the structure testing it, finishing the main stationhouse, finishing the sunnyside exit/entrance, finishing the elevator, finishing the canopy as well as station fixtures. This I have to see!! Maybe it can be done in 5 weeks. Quote Link to comment Share on other sites More sharing options...
Juniorz Posted July 31, 2017 Report Share Posted July 31, 2017 Grand Opening will consist of New Track 4, NB platform and new main station house. Demolition of Temporary stations will occur during the week of July 31st. After the Grand Opening, work will be concentrated on the restoration and rebuilding of the Gerber Building. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted July 31, 2017 Author Report Share Posted July 31, 2017 Alright I was just over there. The temp entrance is being demolished as i speak in fact its mostly gone. The new north entrance is open. I got tons of pics of stationhouses and all entrances I'll upload later and my flyby of course. Quote Link to comment Share on other sites More sharing options...
BusHunter Posted August 1, 2017 Author Report Share Posted August 1, 2017 Here is the flyby for Wilson for 7-31-17. OK here's a bunch of shots of the new north entrance to Wilson A shot from the platform of the stairs and new signage And here's a shot of the new stationhouse And a shot of the temporary stationhouse demolished A look at the platform And a look at the sunnyside entrance and south end of construction Quote Link to comment Share on other sites More sharing options...
BusHunter Posted August 9, 2017 Author Report Share Posted August 9, 2017 Here's my flyby for 8-7-17. This week they have installed more steel for the sunnyside entrance/exit as well as put in some of the concrete flooring for it. they have also put in the concrete acoustical wall from the south end through Wilson, They have installed the glass canopy now covering 2/3rd of the platform. they have begun the track installation over broadway. there is no third rail yet, but if you have a sharp eye you'll see those concrete cannistor things (don't what they are called, left side of the picture below) just north of the platform. That helps deliver the power to the third rail, so they are getting ready to install some power now. Quote Link to comment Share on other sites More sharing options...