7 hours ago, CTA5750 said:

The ramp wont be completed until 2025!!!!  Wow I cant imagine the headaches riders and people from the neighborhood are going to be experiencing. Thats a long time!!! 

I suppose its better than shutting down the Red. Brown, and Purple Lines between Belmont and Wilson (Brown Line at Southpprt) for 5 months straight

 

Link to comment
Share on other sites

7 hours ago, CTA5750 said:

The ramp wont be completed until 2025!!!!  Wow I cant imagine the headaches riders and people from the neighborhood are going to be experiencing. Thats a long time!!! 

The ramp itsself will be done by 2021. Its special trackwork and realignment that's taking till 2025

Link to comment
Share on other sites

15 minutes ago, NewFlyerMCI said:

I got that part. My question is why is the realignment going to take longer than the construction of the flyover?

They're not doing it all at the same time.  The whole project which also includes the modernization of stations between Lawrence and Bryn Mawr and more track work in that corridor will end in 2025.  Remember there's more than just realigning and building a flyover.

Link to comment
Share on other sites

1 hour ago, chicagocubs6323 said:

They're not doing it all at the same time.  The whole project which also includes the modernization of stations between Lawrence and Bryn Mawr and more track work in that corridor will end in 2025.  Remember there's more than just realigning and building a flyover.

Yes, I understand not everything is happening at once, read what I wrote

1 hour ago, NewFlyerMCI said:

I got that part. My question is why is the realignment going to take longer than the construction of the flyover?

I didn't ask why the entire project wasn't going to be finished until 2025. By CTA's projections, construction should start on Lawr-BM & RP Bypass late this winter, and the track realignment after those are completed, I understand this. I am specifically asking about the track realignment only, and why it's going to take 4 years, since I can't find anything on the website as to why it would take 3-4 years if the bypass (which seems like the more demanding project) is only going to take 2.

Link to comment
Share on other sites

1 hour ago, NewFlyerMCI said:

What else is happening during this time period then? That reads like 3-4 years to me.

RPM_RPB.PNG

I literally answered it all for you already.  

 

4 hours ago, chicagocubs6323 said:

The flyover will be done 1st.  After that, CTA will align the tracks between Clark Junction and Addison.

Why are you still arguing with me?

Link to comment
Share on other sites

2 hours ago, chicagocubs6323 said:

I literally answered it all for you already.  

 

Why are you still arguing with me?

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)
  • Upvote 1
Link to comment
Share on other sites

6 hours ago, NewFlyerMCI said:

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)

To realign the tracks, one track will be out of service at a time, similar to the construction of the Belmont Fullerton, and Wilson station. They have to remove the old track and build a new track, and repeat this for each track.  

  • Thanks 2
Link to comment
Share on other sites

6 hours ago, NewFlyerMCI said:

I asked why the realignment was going to take longer (3-4 yrs) as opposed to the flyover (1-2 yrs). You responded that it wasn't going to take 3-4 years. I provided you with proof that it was indeed going to take 3-4 yrs and you respond with "why are you still arguing with me?" I already knew the projects were happening consecutively and not concurrently, but repeating what @Sam92 said wasn't useful in the slightest. If you need me to be absolutely specific so that there's no way you can misinterpret what I wrote, then here:

  • What are the various factors that contribute to the realignment of tracks having an expected time period of 3-4 years to complete? The new flyover is expected to be completed in 1-2 years, however, from my outside perspective, this seems like the more demanding project. Why would the flyover take less time to complete? (Note: I am aware the realignment is occurring after the flyover and station modernizations)

Because with as heavy volume as the Northside handles it can't do a major disruption or shutdown without affecting a HUGE amount of people nor is there space for fast shuttles in such an area

  • Thanks 1
Link to comment
Share on other sites

18 hours ago, Sam92 said:

The ramp itsself will be done by 2021. Its special trackwork and realignment that's taking till 2025

Even so! Im sure there will still be massive headaches as congested as the area is already!  As ,many of us here already know, you shut down one or two through streets street in Wrigleyville  It causes major headaches for the surrounding area  And it will be even more of a mess during Cubs games  And there will no doubt be some slowdowns with all through that junction during the work process 

Link to comment
Share on other sites

56 minutes ago, CTA5750 said:

Even so! Im sure there will still be massive headaches as congested as the area is already!  As ,many of us here already know, you shut down one or two through streets street in Wrigleyville  It causes major headaches for the surrounding area  And it will be even more of a mess during Cubs games  And there will no doubt be some slowdowns with all through that junction during the work process 

Yeah that's what I pointed out in my previous post. The volume passenger and trainwise is too vast for them to do anything to expedite this project outside of closing 1-2 tracks. Then add to that the work is most likely bringing the structure up to Addison to look more like what's at belmont ?

Link to comment
Share on other sites

Actually there should be four tracks available much of the time. Assuming the SB local can be straightend without impacting existing SB local. Then you cut over to new alignment, take out and replace the old, cut over SB express, repeat process. Assuming new does not foul old, as I said. If it does, then three in use at a time.

Yes, it does take a LOT more time to build anything today than 100 years ago, when the SS Main was triple-tracked in months while maintaining service to all stations. Just how it is.

Link to comment
Share on other sites

  • 3 months later...
  • 3 weeks later...
  • 1 month later...
  • 7 months later...
On 3/9/2020 at 11:57 PM, renardo870 said:

Just checking on when work will resume with the Thorndale interlocking and the start of the Montrose interlocking? It seems they took a break for a few weeks now.

Montrose is being worked on now. Montrose has been closed under the red line for days. Looks like a new substation there is part of the closure. Thorndale for the most part looks complete. Might need a few signals for track 1 but the infrastructure and tracks and interlocking is there. Work on the temporary bryn mawr stop has started. Surprised it's being constructed of steel. Why not wood like the cermak branch temp stations was made of. I should have filmed it but I goofed. I'll be going up there from time to time so another day I guess. 

Link to comment
Share on other sites

3 hours ago, BusHunter said:

Montrose is being worked on now. Montrose has been closed under the red line for days. Looks like a new substation there is part of the closure. Thorndale for the most part looks complete. Might need a few signals for track 1 but the infrastructure and tracks and interlocking is there. Work on the temporary bryn mawr stop has started. Surprised it's being constructed of steel. Why not wood like the cermak branch temp stations was made of. I should have filmed it but I goofed. I'll be going up there from time to time so another day I guess. 

all they need at both interlockings are signals and then 100% complete also noticed signal houses are up by berwyn and loyola 

Link to comment
Share on other sites

12 hours ago, Mr.NewFlyer1051 said:

all they need at both interlockings are signals and then 100% complete also noticed signal houses are up by berwyn and loyola 

They had a signal indicater on track 2 at thorndale crossover where you could select your line up. The foundation for the signals are on track 1 but no signals. So you cant select your line on track 1. At berwyn there is also a new substation over the alley. 

Link to comment
Share on other sites

38 minutes ago, BusHunter said:

They had a signal indicater on track 2 at thorndale crossover where you could select your line up. The foundation for the signals are on track 1 but no signals. So you cant select your line on track 1. At berwyn there is also a new substation over the alley. 

yes they have installed 95% signals at thorndale all signal indicators are up i think they are in use now but signals still need to be hooked up and working and yes berwyn has a signal house over the alley and there is a also a new signal house up on the south end of the platform on loyola 

 

also question for anyone will the granville interlocking be removed? since there’s a new one at thorndale

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...